Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy

被引:5
|
作者
Wu, Mei-Fang [1 ]
Chiu, Yuan-Shyi Peter [2 ]
Sung, Peng-Cheng [2 ]
机构
[1] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 407, Taiwan
[2] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung 413, Taiwan
来源
JOURNAL OF ENGINEERING RESEARCH | 2014年 / 2卷 / 04期
关键词
Multi-product EPQ model; multi-delivery plan; optimization; rotation cycle time; scrap; STOCK-DEPENDENT DEMAND; FINITE PRODUCTION-RATE; INVENTORY MODEL; QUALITY-ASSURANCE; PRODUCTION SYSTEM; ECONOMIC LOT; TIME; DETERIORATION; PERFORMANCE; REWORK;
D O I
10.7603/s40632-014-0027-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers optimization of a multi-product economic production quantity (EPQ) model with scrap items and an improved multi-delivery policy. We extend the work of Chiu et al. (2013a) by incorporating an improved n + 1 multi-delivery plan into their model with an aim at reducing vendor's inventory holding cost. Under such a specific shipment policy, for each product an extra delivery of finished goods is made during production uptime to satisfy the product demand for the period of vendor's uptime. Then, when rework process comes to an end (i.e., the rest of the production lot is quality assured) n fixed quantity installments of finished goods are delivered to buyers at a fixed time interval. The objectives of this study are to determine the optimal rotation production cycle time that minimizes the long-run average system cost per unit time and reveals the effects of random scrap rate and the improved delivery policy on the optimal production cycle time. With the help of a mathematical model a closed-form optimal common cycle time is derived. Through a numerical example, practical usages of obtained results and significant savings in vendor's stock holding cost are demonstrated.
引用
收藏
页码:103 / 118
页数:16
相关论文
共 50 条