Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy

被引:5
|
作者
Wu, Mei-Fang [1 ]
Chiu, Yuan-Shyi Peter [2 ]
Sung, Peng-Cheng [2 ]
机构
[1] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 407, Taiwan
[2] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung 413, Taiwan
来源
JOURNAL OF ENGINEERING RESEARCH | 2014年 / 2卷 / 04期
关键词
Multi-product EPQ model; multi-delivery plan; optimization; rotation cycle time; scrap; STOCK-DEPENDENT DEMAND; FINITE PRODUCTION-RATE; INVENTORY MODEL; QUALITY-ASSURANCE; PRODUCTION SYSTEM; ECONOMIC LOT; TIME; DETERIORATION; PERFORMANCE; REWORK;
D O I
10.7603/s40632-014-0027-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers optimization of a multi-product economic production quantity (EPQ) model with scrap items and an improved multi-delivery policy. We extend the work of Chiu et al. (2013a) by incorporating an improved n + 1 multi-delivery plan into their model with an aim at reducing vendor's inventory holding cost. Under such a specific shipment policy, for each product an extra delivery of finished goods is made during production uptime to satisfy the product demand for the period of vendor's uptime. Then, when rework process comes to an end (i.e., the rest of the production lot is quality assured) n fixed quantity installments of finished goods are delivered to buyers at a fixed time interval. The objectives of this study are to determine the optimal rotation production cycle time that minimizes the long-run average system cost per unit time and reveals the effects of random scrap rate and the improved delivery policy on the optimal production cycle time. With the help of a mathematical model a closed-form optimal common cycle time is derived. Through a numerical example, practical usages of obtained results and significant savings in vendor's stock holding cost are demonstrated.
引用
收藏
页码:103 / 118
页数:16
相关论文
共 50 条
  • [11] Bi-objective optimization of multi-product EPQ model with backorders, rework process and random defective rate
    Khalilpourazari, Soheyl
    Pasandideh, Seyed Hamid Reza
    2016 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING (ICIE), 2016,
  • [12] A Bi-objective Multi-Product Multi-Constraint EPQ Model in a Stochastic Environment and Partial Shortage
    Mirkhorsandi, Seyedeh Sanaz
    Pasandideh, Seyed Hamid Reza
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2020, 19 (03) : 567 - 587
  • [13] Intelligent Optimization for an Integrated Inventory Model with Multi-Product and Multi-Storehouse
    Madeiro, Salomao S.
    de Lima Neto, Fernando B.
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 682 - 687
  • [14] Sustainable EOQ and EPQ models for a two-echelon multi-product supply chain with return policy
    Soleymanfar, Vahid Reza
    Makui, Ahmad
    Taleizadeh, Ata Allah
    Tavakkoli-Moghaddam, Reza
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2022, 24 (04) : 5317 - 5343
  • [15] Sustainable EOQ and EPQ models for a two-echelon multi-product supply chain with return policy
    Vahid Reza Soleymanfar
    Ahmad Makui
    Ata Allah Taleizadeh
    Reza Tavakkoli-Moghaddam
    Environment, Development and Sustainability, 2022, 24 : 5317 - 5343
  • [16] A ROBUST OPTIMIZATION MODEL FOR MULTI-PRODUCT PRODUCTION PLANNING IN TERMS OF UNCERTAINTY OF DEMAND AND DELIVERY TIME
    Mehdizadeh, Esmaeil
    Gholami, Hbibreza
    Naderi, Bahman
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2018, 52 (04): : 227 - 240
  • [17] On the multi-product packing-delivery problem with
    Liu, Shuguang
    Lei, Lei
    Park, Suju
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (03) : 350 - 360
  • [18] EXPLORATION OF A MULTI-PRODUCT EPQ-BASED SYSTEM WITH OVERTIME AND QUALITY REASSURANCE
    Chiu, Singa Wang
    Chou, Chung-Li
    Lin, Hong-Dar
    Hwang, Ming-Hon
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2019, 53 (03): : 77 - 94
  • [19] POLICY PROBLEMS WITH MULTI-PRODUCT LOGGING IN ONTARIO
    HERRIDGE, AJ
    FORESTRY CHRONICLE, 1970, 46 (05): : 378 - &
  • [20] Multi-product FPR model with rework and multi-shipment policy resolved by algebraic approach
    Chiu, S. W.
    Sung, P. C.
    Tseng, C. T.
    Chiu, Y. S. P.
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2015, 74 (10): : 555 - 559