Level Scheduling for batched JIT supply

被引:16
|
作者
Boysen, Nils [1 ]
Fliedner, Malte [1 ]
Scholl, Armin [2 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
[2] Univ Jena, Lehrstuhl Betriebswirtschaftliche Entscheidungsan, D-07743 Jena, Germany
关键词
Mixed-model assembly line; Just-in-time; Sequencing; Level Scheduling; Batched part supply; MODEL ASSEMBLY LINES; TIME PRODUCTION SYSTEMS; MIXED-MODEL;
D O I
10.1007/s10696-009-9058-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so-called Level Scheduling, which aims at distributing the part consumption induced by the model sequence evenly over time. Traditional Level Scheduling seeks to closely approximate target demand rates at every production cycle, however, such a strict leveling is only required if parts are directly pulled from a connected feeder line. In real-world assembly lines, parts are predominately delivered in (small) batches at certain points in time. In such a situation, a Just-in-Time supply is already facilitated whenever the cumulative consumption is leveled in accordance with each part's delivery schedule, while the exact consumption pattern between two delivery points seems irrelevant. The paper on hand provides new Level Scheduling models, proves complexity, presents exact and heuristic solution procedures and shows inferiority of traditional Level Scheduling for such a batched JIT-supply of parts.
引用
收藏
页码:31 / 50
页数:20
相关论文
共 50 条
  • [41] Joint Optimal Lot Size Policy for a JIT Supply Chain
    Wang Weihua
    Yang Xiaoyan
    LOGISTICS RESEARCH AND PRACTICE IN CHINA, 2008, : 259 - 264
  • [42] Supply chain design in the electronics industry incorporating JIT purchasing
    Singh, Om Pal
    Chand, Satish
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2009, 3 (01) : 21 - 44
  • [43] Supply Chain Scheduling
    Sriskandarajah, Chelliah
    INFORMS JOURNAL ON APPLIED ANALYTICS, 2023, 53 (02): : 169 - 172
  • [44] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    TANG HengYong~+ ZHAO ChuanLi CHENG CongDian College of Mathematics and Systems Science
    ScienceinChina(SeriesA:Mathematics), 2008, (02) : 273 - 292
  • [45] Modeling of Steelmaking-Continual Casting Production Scheduling Based on JIT
    Zhang Xinglan
    Ouyang Qi
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2144 - +
  • [46] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    HengYong Tang
    ChuanLi Zhao
    CongDian Cheng
    Science in China Series A: Mathematics, 2008, 51 : 273 - 292
  • [47] Scheduling mixed-model final assembly lines in JIT manufacturing
    Mohammadi, G.
    Ozbayrak, M.
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2006, 19 (04) : 377 - 382
  • [48] Inter-block scoreboard scheduling in a JIT compiler for VLIW processors
    de Dinechin, Benoit Dupont
    EURO-PAR 2008 PARALLEL PROCESSING, PROCEEDINGS, 2008, 5168 : 370 - 381
  • [49] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    Tang HengYong
    Zhao ChuanLi
    Cheng CongDian
    SCIENCE IN CHINA SERIES A-MATHEMATICS, 2008, 51 (02): : 273 - 292
  • [50] JIT APPROACH TO INTEGRATING PRODUCTION ORDER SCHEDULING AND PRODUCTION ACTIVITY CONTROL
    BANERJEE, P
    ARMOUTI, HA
    COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1992, 5 (04): : 283 - 290