Level Scheduling for batched JIT supply

被引:16
|
作者
Boysen, Nils [1 ]
Fliedner, Malte [1 ]
Scholl, Armin [2 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
[2] Univ Jena, Lehrstuhl Betriebswirtschaftliche Entscheidungsan, D-07743 Jena, Germany
关键词
Mixed-model assembly line; Just-in-time; Sequencing; Level Scheduling; Batched part supply; MODEL ASSEMBLY LINES; TIME PRODUCTION SYSTEMS; MIXED-MODEL;
D O I
10.1007/s10696-009-9058-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so-called Level Scheduling, which aims at distributing the part consumption induced by the model sequence evenly over time. Traditional Level Scheduling seeks to closely approximate target demand rates at every production cycle, however, such a strict leveling is only required if parts are directly pulled from a connected feeder line. In real-world assembly lines, parts are predominately delivered in (small) batches at certain points in time. In such a situation, a Just-in-Time supply is already facilitated whenever the cumulative consumption is leveled in accordance with each part's delivery schedule, while the exact consumption pattern between two delivery points seems irrelevant. The paper on hand provides new Level Scheduling models, proves complexity, presents exact and heuristic solution procedures and shows inferiority of traditional Level Scheduling for such a batched JIT-supply of parts.
引用
收藏
页码:31 / 50
页数:20
相关论文
共 50 条
  • [22] Integrated Supply Chain Scheduling under Multi-Level Disruptions
    Sawik, T.
    IFAC PAPERSONLINE, 2015, 48 (03): : 1515 - 1520
  • [23] Batch scheduling in a two-level supply chain - a focus on the supplier
    Selvarajah, Esaignani
    Steiner, George
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) : 226 - 240
  • [24] A Strategic Framework for Managing Failure in JIT Supply Chains
    Balakrishnan, Jaydeep
    Bowen, Frances
    Eckstein, Astrid L. H.
    INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND SUPPLY CHAIN MANAGEMENT, 2008, 1 (04) : 20 - 38
  • [25] JIT Supply Alliance: A New Procurement Option for Contractors
    Liu Songhe
    Li Zhongfu
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 169 - 172
  • [26] Analysis of parts requirements variance for a JIT supply chain
    Aigbedo, H
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (02) : 417 - 430
  • [27] Radar: Reducing Tail Latencies for Batched Stream Processing with Blank Scheduling
    Chen, Fei
    Wu, Song
    Jin, Hai
    Lin, Liwei
    Li, Rui
    IEEE 20TH INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING AND COMMUNICATIONS / IEEE 16TH INTERNATIONAL CONFERENCE ON SMART CITY / IEEE 4TH INTERNATIONAL CONFERENCE ON DATA SCIENCE AND SYSTEMS (HPCC/SMARTCITY/DSS), 2018, : 797 - 804
  • [28] ScorpioBase: An Efficient Batched Blockchain System for Traceability Applications in Supply Chain
    Sui, Yuan
    Yang, Xiaochun
    Wang, Bin
    Zhang, Yujie
    Wang, Wei
    Wang, Lina
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2025,
  • [29] JIT/TQC INTEGRATED AT OPERATOR LEVEL.
    Baum, David
    Modern Machine Shop, 1986, 59 (07) : 70 - 74
  • [30] Improved results for scheduling batched parallel jobs by using a generalized analysis framework
    He, Yuxiong
    Sun, Hongyang
    Hsu, Wen-Jing
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2010, 70 (02) : 173 - 182