Level Scheduling for batched JIT supply

被引:16
|
作者
Boysen, Nils [1 ]
Fliedner, Malte [1 ]
Scholl, Armin [2 ]
机构
[1] Univ Jena, Lehrstuhl Operat Management, D-07743 Jena, Germany
[2] Univ Jena, Lehrstuhl Betriebswirtschaftliche Entscheidungsan, D-07743 Jena, Germany
关键词
Mixed-model assembly line; Just-in-time; Sequencing; Level Scheduling; Batched part supply; MODEL ASSEMBLY LINES; TIME PRODUCTION SYSTEMS; MIXED-MODEL;
D O I
10.1007/s10696-009-9058-z
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so-called Level Scheduling, which aims at distributing the part consumption induced by the model sequence evenly over time. Traditional Level Scheduling seeks to closely approximate target demand rates at every production cycle, however, such a strict leveling is only required if parts are directly pulled from a connected feeder line. In real-world assembly lines, parts are predominately delivered in (small) batches at certain points in time. In such a situation, a Just-in-Time supply is already facilitated whenever the cumulative consumption is leveled in accordance with each part's delivery schedule, while the exact consumption pattern between two delivery points seems irrelevant. The paper on hand provides new Level Scheduling models, proves complexity, presents exact and heuristic solution procedures and shows inferiority of traditional Level Scheduling for such a batched JIT-supply of parts.
引用
收藏
页码:31 / 50
页数:20
相关论文
共 50 条
  • [1] Level Scheduling for batched JIT supply
    Nils Boysen
    Malte Fliedner
    Armin Scholl
    Flexible Services and Manufacturing Journal, 2009, 21 : 31 - 50
  • [2] Batched disk scheduling with delays
    Dept. of Computer Science, Ben-Gurion U., Beer-Sheva, 84105, Israel
    不详
    Perform Eval Rev, 2006, 4 (36-41):
  • [3] JIT - SCHEDULING FOR SUCCESS
    HARRISON, MC
    JIT IS HERE TO STAY: MANAGING FOR SUCCESS, 1989, : 245 - 254
  • [4] JIT production, JIT supply and performance: investigating the moderating effects
    Danese, Pamela
    Romano, Pietro
    Bortolotti, Thomas
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2012, 112 (3-4) : 441 - 465
  • [5] JIT scheduling revitalizes a job shop
    Pande, Sunil
    Quinn, Paul
    ID Systems, 2002, 22 (02):
  • [6] JIT scheduling rules: A simulation evaluation
    Hum, Sin-Hoon
    Lee, Chee-Kwong
    Omega, 1998, 26 (03): : 381 - 395
  • [7] Crossdocking - JIT scheduling with time windows
    Li, Y
    Lim, A
    Rodrigues, B
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (12) : 1342 - 1351
  • [8] JIT scheduling rules: a simulation evaluation
    Hum, SH
    Lee, CK
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1998, 26 (03): : 381 - 395
  • [9] Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
    Emde, Simon
    Boysen, Nils
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 217 (02) : 287 - 299
  • [10] MANAGEMENT CONTROL IN SUPPLY CHAIN JIT
    BAXTER, LF
    FERGUSON, N
    MACBETH, DK
    NEIL, GC
    JIT IS HERE TO STAY: MANAGING FOR SUCCESS, 1989, : 145 - 153