A joint chance-constrained programming approach for call center workforce scheduling under uncertain call arrival forecasts

被引:15
|
作者
Excoffier, M. [1 ]
Gicquel, C. [1 ]
Jouini, O. [2 ]
机构
[1] Univ Paris 11, Rech Informat Lab, Campus Orsay,Batiment 650, F-91405 Orsay, France
[2] Ecole Cent Paris, Lab Genie Ind, F-92290 Chatenay Malabry, France
关键词
Personnel planning; Call center shift scheduling; Customer abandonment; Stochastic programming; Probabilistic constraints; Mixed-integer linear programming; PROBABILISTIC CONSTRAINTS; OPTIMIZATION;
D O I
10.1016/j.cie.2016.03.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider a workforce management problem arising in call centers, namely the shift-scheduling problem. It consists in determining the number of agents to be assigned to a set of predefined shifts so as to optimize the trade-off between manpower cost and customer quality of service. We focus on explicitly taking into account in the shift-scheduling problem the uncertainties in the future call arrival rates forecasts. We model them as independent random variables following a continuous probability distribution. The resulting stochastic optimization problem is handled as a joint chance-constrained program and is reformulated as an equivalent large-size mixed-integer linear program. One key point of the proposed solution approach is that this reformulation is achieved without resorting to a scenario generation procedure to discretize the continuous probability distributions. Our computational results show that the proposed approach can efficiently solve real-size instances of the problem, enabling us to draw some useful managerial insights on the underlying risk-cost trade-off. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:16 / 30
页数:15
相关论文
共 40 条
  • [31] Optimization of truck-shovel allocation in open-pit mines under uncertainty: a chance-constrained goal programming approach
    Mohtasham, Mehrnaz
    Mirzaei-Nasirabad, Hossein
    Alizadeh, Behrooz
    MINING TECHNOLOGY-TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY, 2021, 130 (02) : 81 - 100
  • [32] Irrigation water resources management under uncertainty: An interval nonlinear double-sided fuzzy chance-constrained programming approach
    Zhang, Chenglong
    Guo, Ping
    Huo, Zailin
    AGRICULTURAL WATER MANAGEMENT, 2021, 245
  • [33] A two-bar truss structural model under uncertainty: a uncertain chance constrained geometric programming (UCCGP) approach
    Mandal, Wasim Akram
    INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2019, 13 (02): : 471 - 485
  • [34] A two-bar truss structural model under uncertainty: a uncertain chance constrained geometric programming (UCCGP) approach
    Wasim Akram Mandal
    International Journal on Interactive Design and Manufacturing (IJIDeM), 2019, 13 : 471 - 485
  • [35] A robust chance-constrained programming approach for a bi-objective pre-emptive multi-mode resource-constrained project scheduling problem with time crashing
    Shahabi-Shahmiri, Reza
    Kyriakidis, Thomas S.
    Ghasemi, Mohammad
    Mirnezami, Seyed-Ali
    Mirjalili, Seyedali
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2023, 10 (01)
  • [36] An interval multistage joint-probabilistic chance-constrained programming model with left-hand-side randomness for crop area planning under uncertainty
    Zhang, Chenglong
    Li, Mo
    Guo, Ping
    JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 1276 - 1289
  • [37] Two-Stage Distributed Energy Resources Scheduling via Chance-Constrained AC Optimal Power Flow: A Second-Order Cone Programming Approach
    He, Mingyue
    Soltani, Zahra
    Khorsand, Mojdeh
    2020 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2020,
  • [38] A Chance Constrained Programming Approach for No-Wait Flow Shop Scheduling Problem under the Interval-Valued Fuzzy Processing Time
    Sun, Hao
    Jiang, Aipeng
    Ge, Dongming
    Zheng, Xiaoqing
    Gao, Farong
    PROCESSES, 2021, 9 (05)
  • [39] A Bi-Objective Fuzzy Credibilistic Chance-Constrained Programming Approach for the Hazardous Materials Road-Rail Multimodal Routing Problem under Uncertainty and Sustainability
    Sun, Yan
    Li, Xinya
    Liang, Xia
    Zhang, Cevin
    SUSTAINABILITY, 2019, 11 (09)
  • [40] Low-Carbon Water-Rail-Road Multimodal Routing Problem with Hard Time Windows for Time-Sensitive Goods Under Uncertainty: A Chance-Constrained Programming Approach
    Sun, Yan
    Ge, Yan
    Li, Min
    Zhang, Chen
    SYSTEMS, 2024, 12 (11):