A joint chance-constrained programming approach for call center workforce scheduling under uncertain call arrival forecasts

被引:15
|
作者
Excoffier, M. [1 ]
Gicquel, C. [1 ]
Jouini, O. [2 ]
机构
[1] Univ Paris 11, Rech Informat Lab, Campus Orsay,Batiment 650, F-91405 Orsay, France
[2] Ecole Cent Paris, Lab Genie Ind, F-92290 Chatenay Malabry, France
关键词
Personnel planning; Call center shift scheduling; Customer abandonment; Stochastic programming; Probabilistic constraints; Mixed-integer linear programming; PROBABILISTIC CONSTRAINTS; OPTIMIZATION;
D O I
10.1016/j.cie.2016.03.013
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We consider a workforce management problem arising in call centers, namely the shift-scheduling problem. It consists in determining the number of agents to be assigned to a set of predefined shifts so as to optimize the trade-off between manpower cost and customer quality of service. We focus on explicitly taking into account in the shift-scheduling problem the uncertainties in the future call arrival rates forecasts. We model them as independent random variables following a continuous probability distribution. The resulting stochastic optimization problem is handled as a joint chance-constrained program and is reformulated as an equivalent large-size mixed-integer linear program. One key point of the proposed solution approach is that this reformulation is achieved without resorting to a scenario generation procedure to discretize the continuous probability distributions. Our computational results show that the proposed approach can efficiently solve real-size instances of the problem, enabling us to draw some useful managerial insights on the underlying risk-cost trade-off. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:16 / 30
页数:15
相关论文
共 40 条
  • [21] An interval-parameter chance-constrained dynamic programming approach for capacity planning under uncertainty
    Dai, C.
    Li, Y. P.
    Huang, G. H.
    RESOURCES CONSERVATION AND RECYCLING, 2012, 62 : 37 - 50
  • [22] Frequency Constrained Scheduling Under Multiple Uncertainties via Data-Driven Distributionally Robust Chance-Constrained Approach
    Yang, Lun
    Li, Zhihao
    Xu, Yinliang
    Zhou, Jianguo
    Sun, Hongbin
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2023, 14 (02) : 763 - 776
  • [23] A machine learning-based adaptive heuristic for vessel scheduling problem under uncertainty via chance-constrained programming
    Li, Runfo
    Zhang, Xinyu
    Wang, Chengbo
    Cui, Jinlong
    Mu, Mengfeng
    COMPUTERS & ELECTRICAL ENGINEERING, 2024, 119
  • [24] A Chance-Constrained Programming Approach to Preoperative Planning of Robotic Cardiac Surgery Under Task-Level Uncertainty
    Azimian, Hamidreza
    Naish, Michael D.
    Kiaii, Bob
    Patel, Rajni V.
    IEEE JOURNAL OF BIOMEDICAL AND HEALTH INFORMATICS, 2015, 19 (02) : 612 - 622
  • [25] A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand
    Céline Gicquel
    Jianqiang Cheng
    Annals of Operations Research, 2018, 264 : 123 - 155
  • [26] ICCSIP: An inexact chance-constrained semi-infinite programming approach for energy systems planning under uncertainty
    Guo, P.
    Huang, G. H.
    He, L.
    Cai, Y. P.
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2008, 30 (14-15) : 1345 - 1366
  • [27] A joint chance-constrained programming approach for the single-item capacitated lot-sizing problem with stochastic demand
    Gicquel, Celine
    Cheng, Jianqiang
    ANNALS OF OPERATIONS RESEARCH, 2018, 264 (1-2) : 123 - 155
  • [28] Inexact Fuzzy Chance-Constrained Nonlinear Programming Approach for Crop Water Allocation under Precipitation Variation and Sustainable Development
    Guo, Ping
    Wang, Xiaoling
    Zhu, Hua
    Li, Mo
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (09)
  • [29] Community-scale renewable energy systems planning under uncertainty-An interval chance-constrained programming approach
    Cai, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Lin, Q. G.
    Tan, Q.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (04): : 721 - 735
  • [30] Chance-constrained multi-objective approach for hazardous materials routing and scheduling under demand and service time uncertainty
    Moghaddam, Kamran S.
    Azadian, Farshid
    JOURNAL OF MULTI-CRITERIA DECISION ANALYSIS, 2020, 27 (5-6) : 318 - 336