Evaluating the "as-built' performance of an eco-housing development in the UK

被引:23
|
作者
Gupta, R. [1 ,2 ]
Kapsali, M. [2 ]
机构
[1] Oxford Brookes Univ, FCIBSE, Sch Architecture, Low Carbon Bldg Grp, Headington Campus,Gipsy Lane, Oxford OX3 0BP, England
[2] Oxford Brookes Univ, Sch Architecture, Low Carbon Bldg Grp, Headington Campus,Gipsy Lane, Oxford OX3 0BP, England
关键词
Low carbon houses; performance gap; building performance evaluation; social housing; LOW-ENERGY; CONSUMPTION;
D O I
10.1177/0143624416629404
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper uses a socio-technical building performance evaluation approach to forensically and systematically evaluate the actual performance of two case study dwellings located in a flagship eco-housing development in the UK, during the post-construction/initial occupation stage. The 12-month study captures the as-built' performance of the building envelope (principally heat loss) and installed equipment along with remote monitoring of energy use and environmental conditions, review of the handover processes and initial experiences of the occupants in relation to the home environment. It is found that actual annual energy use and CO2 emissions of the case study dwellings exceed design predictions by factors of 1.8 and 2.5, respectively. The main reasons for this gap are complex interdependencies that occur across the performance of building fabric and energy systems, usability of controls and occupant expectations and behaviour. Underperformance of mechanical ventilation and heat recovery systems and air source heat pumps results from inadequate commissioning and maintenance procedures and poor occupant control due to complex control interfaces. Furthermore, unclear user guidance and inadequate training during handover lead to poor occupant understanding of the mechanical ventilation and heat recovery systems and heat pumps, resulting in their misuse. The findings have proved that building performance evaluation processes are vital for examining operational outcomes and discovering performance-related issues that would otherwise go unreported and lead to bigger problems in future. Practical application: The methodological approach for evaluating housing performance adopted in this study provides design and construction teams with a practical approach to diagnose workmanship issues with building fabric and any installation or commissioning issues with energy systems and services. Maintenance regime of heating and ventilation system should be clarified at the installation and commissioning stage. Maintenance contracts should be set up for unfamiliar low carbon systems such as heat pumps, MVHR. Occupants need to be trained through graduated and extended handover that involves occupants trying out systems and controls in the presence of trained housing officers, supplemented by visual home user guides (developed by the architects) offering clear guidance on the daily and seasonal operation of systems and controls. Learning from such real-world case studies, from design to early occupation, is helpful in understanding the exact causes of the performance gap and how it can be addressed.
引用
收藏
页码:220 / 242
页数:23
相关论文
共 50 条
  • [31] A Grism Design Review and the As-Built Performance of the Silicon Grisms for JWST-NIRCam
    Deen, Casey P.
    Gully-Santiago, Michael
    Wang, Weisong
    Pozderac, Jasmina
    Mar, Douglas J.
    Jaffe, Daniel T.
    PUBLICATIONS OF THE ASTRONOMICAL SOCIETY OF THE PACIFIC, 2017, 129 (976)
  • [32] Enhancing commonly used model predictions for constructed wetland performance: as-built design considerations
    Kincanon, R
    McAnally, AS
    ECOLOGICAL MODELLING, 2004, 174 (03) : 309 - 322
  • [33] Computational algorithm to automate as-built schedule development using digital daily work reports
    Shrestha, K. Joseph
    Jeong, H. David
    AUTOMATION IN CONSTRUCTION, 2017, 84 : 315 - 322
  • [34] Eco-Sustainable housing development for vulnerable population
    Salazar, Edgar A.
    Arroyave, Juan F.
    Moreno, Ivan Y.
    INGENIERIA Y COMPETITIVIDAD, 2014, 16 (01): : 235 - 245
  • [35] Earthworks to reclaim UK quarry for housing development
    Jarvis, Stewart T.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2011, 164 (02) : 79 - 87
  • [36] Evaluation of seismic performance of as-built and retrofitted reinforced concrete frame structures with LAP splice deficiencies
    Opabola, Eyitayo A.
    Elwood, Kenneth J.
    Liel, Abbie B.
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2021, 50 (12): : 3138 - 3159
  • [37] Design of optical systems that maximize as-built performance using tolerance/compensator-informed optimization
    Bauman, Brian J.
    Schneider, Michael D.
    OPTICS EXPRESS, 2018, 26 (11): : 13819 - 13840
  • [38] A Procedure for the Performance Evaluation of a New Commercial Building: Part I-Calibrated As-Built Simulation
    Song, Suwon
    Haberl, Jeff S.
    ASHRAE TRANSACTIONS 2008, VOL 114, PT 2, 2008, 114 : 375 - +
  • [39] Deconstruct: A scalable method of as-built heat power loss coefficient inference for UK dwellings using smart meter data
    Chambers, Jonathan D.
    Oreszczyn, Tadj
    ENERGY AND BUILDINGS, 2019, 183 (443-453) : 443 - 453
  • [40] Evaluating research performance in tourism: the UK experience
    Page, SJ
    TOURISM MANAGEMENT, 2003, 24 (06) : 607 - 622