Evaluating the "as-built' performance of an eco-housing development in the UK

被引:23
|
作者
Gupta, R. [1 ,2 ]
Kapsali, M. [2 ]
机构
[1] Oxford Brookes Univ, FCIBSE, Sch Architecture, Low Carbon Bldg Grp, Headington Campus,Gipsy Lane, Oxford OX3 0BP, England
[2] Oxford Brookes Univ, Sch Architecture, Low Carbon Bldg Grp, Headington Campus,Gipsy Lane, Oxford OX3 0BP, England
关键词
Low carbon houses; performance gap; building performance evaluation; social housing; LOW-ENERGY; CONSUMPTION;
D O I
10.1177/0143624416629404
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper uses a socio-technical building performance evaluation approach to forensically and systematically evaluate the actual performance of two case study dwellings located in a flagship eco-housing development in the UK, during the post-construction/initial occupation stage. The 12-month study captures the as-built' performance of the building envelope (principally heat loss) and installed equipment along with remote monitoring of energy use and environmental conditions, review of the handover processes and initial experiences of the occupants in relation to the home environment. It is found that actual annual energy use and CO2 emissions of the case study dwellings exceed design predictions by factors of 1.8 and 2.5, respectively. The main reasons for this gap are complex interdependencies that occur across the performance of building fabric and energy systems, usability of controls and occupant expectations and behaviour. Underperformance of mechanical ventilation and heat recovery systems and air source heat pumps results from inadequate commissioning and maintenance procedures and poor occupant control due to complex control interfaces. Furthermore, unclear user guidance and inadequate training during handover lead to poor occupant understanding of the mechanical ventilation and heat recovery systems and heat pumps, resulting in their misuse. The findings have proved that building performance evaluation processes are vital for examining operational outcomes and discovering performance-related issues that would otherwise go unreported and lead to bigger problems in future. Practical application: The methodological approach for evaluating housing performance adopted in this study provides design and construction teams with a practical approach to diagnose workmanship issues with building fabric and any installation or commissioning issues with energy systems and services. Maintenance regime of heating and ventilation system should be clarified at the installation and commissioning stage. Maintenance contracts should be set up for unfamiliar low carbon systems such as heat pumps, MVHR. Occupants need to be trained through graduated and extended handover that involves occupants trying out systems and controls in the presence of trained housing officers, supplemented by visual home user guides (developed by the architects) offering clear guidance on the daily and seasonal operation of systems and controls. Learning from such real-world case studies, from design to early occupation, is helpful in understanding the exact causes of the performance gap and how it can be addressed.
引用
收藏
页码:220 / 242
页数:23
相关论文
共 50 条
  • [11] THE PERFORMANCE OF ECO-REFURBISHED HOUSING UNDER CURRENT AND FUTURE UK CLIMATES
    Mohammadpourkarbasi, Haniyeh
    Sharples, Steve
    SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, : 123 - 126
  • [12] Study of tolerancing optimization approaches in Zemax for as-built performance
    Joo, Joonha
    Alisafaee, Hossein
    OPTICAL SYSTEM ALIGNMENT, TOLERANCING, AND VERIFICATION XIII, 2020, 11488
  • [13] Evaluating UK housing policies to tackle housing affordability
    Poon, Joanna
    Garratt, Dean
    INTERNATIONAL JOURNAL OF HOUSING MARKETS AND ANALYSIS, 2012, 5 (03) : 253 - 271
  • [14] Lateral Performance of As-Built and Retrofitted Timber Diaphragm Fastener Connections
    Schiro, Gianni
    Giongo, Ivan
    Ingham, Jason M.
    Dizhur, Dmytro
    JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2018, 30 (01)
  • [15] Investigating the performance of as-built and overlaid pavements: a competing risks approach
    Yang, Jidong
    Kim, Sung-Hee
    INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2015, 16 (03) : 191 - 197
  • [16] A rational method for relating as-built quality to pavement performance and value
    Weed, RM
    CONSTRUCTION QUALITY AND MANAGEMENT, 1998, (1632): : 32 - 39
  • [17] EXPERIMENTAL RESEARCH ON INFILL-TYPE DETACHED HOUSING ESTATES THAT CONTRIBUTE TO THE SUSTAINABILITY OF LOCAL COMMUNITIES Example of Wakasa Uriwari eco-housing estates
    Nojima, Shinji
    Ishihara, Shutaro
    AIJ Journal of Technology and Design, 2022, 28 (69): : 912 - 917
  • [18] DIMENSIONAL PERFORMANCE OF AS-BUILT ASSEMBLIES IN POLYJET ADDITIVE MANUFACTURING PROCESS
    Haghighi, Azadeh
    Yang, Yiran
    Li, Lin
    PROCEEDINGS OF THE ASME 12TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE - 2017, VOL 2, 2017,
  • [19] Design and Development of As-built Documents Management System based on BIM
    Cai, Chunming
    Lu, Jianfeng
    Li, Dezhong
    APPLIED SCIENCE, MATERIALS SCIENCE AND INFORMATION TECHNOLOGIES IN INDUSTRY, 2014, 513-517 : 2492 - 2495
  • [20] Productive modeling for development of as-built BIM of existing indoor structures
    Jung, Jaehoon
    Hong, Sungchul
    Jeong, Seongsu
    Kim, Sangmin
    Cho, Hyoungsig
    Hong, Seunghwan
    Heo, Joon
    AUTOMATION IN CONSTRUCTION, 2014, 42 : 68 - 77