A Problem of Scheduling Operations at a Locomotive Maintenance Depot

被引:0
|
作者
Lazarev, A. A. [1 ,2 ,3 ,4 ]
Musatova, E. G. [1 ]
Grishin, E. M. [1 ,2 ]
Tarasov, G., V [1 ,2 ]
Galakhov, S. A. [1 ,2 ]
Pravdivets, N. A. [1 ]
机构
[1] Russian Acad Sci, VA Trapeznikov Inst Control Sci, Profsoyuznaya Str 65, Moscow, Russia
[2] Lomonosov Moscow State Univ, Leninskie Gory Str 1-2, Moscow, Russia
[3] Natl Res Univ Higher Sch Econ, Myasnitskaya Str 20, Moscow, Russia
[4] Moscow Inst Phys & Technol, Inst Lane 9, Dolgoprudnyi, Moscow Region, Russia
基金
俄罗斯基础研究基金会;
关键词
Maintenance; Scheduling; Dynamic programming; Constraint programming; Heuristic; SEARCH;
D O I
10.1007/978-3-030-38603-0_23
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In this article, we consider the problem of planning maintenance operations at a locomotive maintenance depot. There are three types of tracks at the depot: buffer tracks, access tracks and service tracks. A depot consists of up to one buffer track and a number of access tracks, each of them ending with one service track. Each of these tracks has a limited capacity measured in locomotive sections. We present a constraint programming model and a greedy algorithm for solving the problem of planning maintenance operations. Using lifelike data based on the operation of several locomotive maintenance depots in Eastern polygon of Russian Railways, we carry out numerical experiments to compare the presented approaches.
引用
收藏
页码:311 / 325
页数:15
相关论文
共 50 条
  • [31] Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies
    Benbouzid-Sitayeb F.
    Guebli S.A.
    Bessadi Y.
    Varnier C.
    Zerhouni N.
    International Journal of Manufacturing Research, 2011, 6 (01) : 30 - 48
  • [32] ORGANIZATION OF RAILROAD VEHICLE MAINTENANCE VIA OPERATIONS SCHEDULING
    KIRCHENKAMP, W
    STAHL UND EISEN, 1976, 96 (22): : 1125 - 1126
  • [33] Research on assembly scheduling problem with nested operations
    Hao, Haiqiang
    Zhu, Haiping
    Shen, Liezheng
    Zhen, Guohui
    Chen, Zhipeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 175
  • [34] Digital locomotive depot on the basis of process control
    Mo, YM
    Tian, E
    Xiao, J
    ISTM/2005: 6th International Symposium on Test and Measurement, Vols 1-9, Conference Proceedings, 2005, : 4000 - 4003
  • [35] A COLUMN GENERATION APPROACH TO THE MULTIPLE-DEPOT VEHICLE SCHEDULING PROBLEM
    RIBEIRO, CC
    SOUMIS, F
    OPERATIONS RESEARCH, 1994, 42 (01) : 41 - 52
  • [36] An exact algorithm for multi depot and multi period vehicle scheduling problem
    Kang, KH
    Lee, YH
    Lee, BK
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 350 - 359
  • [37] A batch sizing and scheduling problem on parallel machines with different speeds, maintenance operations, setup times and energy costs
    Nattaf, Margaux
    Artigues, Christian
    Lopez, Pierre
    Medina, Rosa
    Parada, Victor
    Pradenas, Lorena
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 883 - 891
  • [38] A branch-and-cut algorithm for the multiple depot vehicle scheduling problem
    Hadjar, A
    Marcotte, O
    Soumis, F
    OPERATIONS RESEARCH, 2006, 54 (01) : 130 - 149
  • [39] A railway maintenance scheduling problem with customer costs
    Heinicke, Franziska
    Simroth, Axel
    Scheithauer, Guntram
    Fischer, Andreas
    EURO JOURNAL ON TRANSPORTATION AND LOGISTICS, 2015, 4 (01) : 113 - 137
  • [40] Learning to branch in the generation maintenance scheduling problem
    Mei, Jingcheng
    Hu, Jingbo
    Wan, Zhengdong
    Qi, Donglian
    GLOBAL ENERGY INTERCONNECTION-CHINA, 2022, 5 (04): : 409 - 417