Factors Affecting the Performance of Construction Projects in Pakistan

被引:2
|
作者
Iqbal, Muhammad [1 ]
Khan, Imtiaz [1 ]
Ahmad, Fawad [1 ]
Ahad, Muhammad Zeeshan [1 ]
Munir, Mehre [2 ]
机构
[1] Iqra Natl Univ, Dept Civil Engn, Peshawar, Pakistan
[2] Iqra Natl Univ, Dept Elect Engn, Peshawar, Pakistan
来源
JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES | 2019年 / 14卷 / 03期
关键词
Construction Project; the project performance objectives; planning; designing programming; infrastructure projects;
D O I
10.26782/jmcms.2019.06.00025
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
There is a French dictum "when the construction industry prospers everything prospers". Construction, a term that encompasses activities related to the creation of physical infrastructure and related activities, plays a crucial role in the economy of any country with estimated share of 40-60 % in gross fixed capital formation and having linkage of more than 60 other associated industries. Today, construction is the second largest sector in Pakistan's economy after agriculture. Roughly 30-35% of employment is directly or indirectly affiliated with the construction sector. In Pakistan, a Construction Project can be categorized as high risk as it is very complex and involves a variety of stakeholders looking after their own interests. In order to make sure that the projects are completed within the key measures of budgeted cost, allocated time and required quality, identification of causes affecting the project performance is very much necessary so that stakeholders can take proactive steps to avoid such situations and manage effectively and systematically to achieve the project performance objectives of time, cost and quality. The purpose of this Paper is to investigate the major obstacles and constraints in the performance of construction projects in Pakistan. In this paper a local construction project case study and facts which I observed during my 16+ years of experience in dealing with construction projects are taken into account to document the bottlenecks. The case study is the construction of Earth Dam Project in Tribal region of KPK, where I worked as a Resident Engineer. The project performance has been suffered adversely equally by roles played by the design consultant, the Employer, the supervisory consultant, the Contractor and country political situation and regional security. Finally, main recommendations with discussions are presented that will help to overcome the related obstacles and hindrances in project performance in construction industry of Pakistan. Similar methodology is adopted in Document of the World Bank Discussion Paper Series: Technical Note:9 LOCAL CASE STUDIES November 2007, where case studies of several past infrastructure projects in different sectors including roads, airport, motoway and irrigation were reviewed to document the bottlenecks which occurred during the various processes involved in the life cycle of infrastructure projects. Identifying such processes allows a better understanding of the capacity constraints in planning, designing, programming, procurement, contract administration, financing and budgeting, execution and other stages in a project cycle.
引用
收藏
页码:336 / 358
页数:23
相关论文
共 50 条
  • [41] Factors influencing the performance of architects in construction projects
    Marisa, Amy
    Yusof, Nor'Aini
    CONSTRUCTION ECONOMICS AND BUILDING, 2020, 20 (03): : 20 - 36
  • [42] Comparative Analysis of Factors Causing Delay in Residential Construction Projects in Pakistan
    Din, Zia Ud
    Raza, Ali
    Khan, Muhammad Babar
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 640 - 648
  • [43] Factors affecting the cost performance of transport infrastructure projects
    Moschouli, Eleni
    Soecipto, Raden Murwantara
    Vanelslander, Thierry
    Verhoest, Koen
    EUROPEAN JOURNAL OF TRANSPORT AND INFRASTRUCTURE RESEARCH, 2018, 18 (04): : 535 - 554
  • [44] Identification of coordination factors affecting building projects performance
    Alaloul, Wesam Salah
    Liew, Mohd Shahir
    Zawawi, Noor Amila Wan Abdullah
    ALEXANDRIA ENGINEERING JOURNAL, 2016, 55 (03) : 2689 - 2698
  • [45] Risk factors affecting the performance of public works construction projects in developing countries: a case study of Lebanon
    Kalakesh, Olivia
    Shatila, Walid
    Hatoum, Ali
    INTERNATIONAL JOURNAL OF MASONRY RESEARCH AND INNOVATION, 2025, 10 (01)
  • [46] Critical factors affecting the performance of large construction projects in developing countries A case study of Sri Lanka
    San Santoso, Djoen
    Gallage, Polwatta Gallage Madusha Piumal
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 18 (03) : 531 - 556
  • [47] Builders Perceptions on the Factors to be Monitored at Tendering and Mobilization Stage Affecting the Performance of South Indian Construction Projects
    Divakar K.
    Journal of The Institution of Engineers (India): Series A, 2019, 100 (01) : 33 - 39
  • [48] Examining factors affecting sustainable performance of building construction projects in Ghana using structural equation modelling
    Iddi, Fawan Issah
    Padala, S. P. Sreenivas
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024,
  • [49] Key Factors Affecting Steel Construction Projects' Performance by Adopting Building Information Modeling (BIM) in Egypt
    Soliman, Shorouk M.
    Elhegazy, Hosam Mostafa
    Zhang, Jiansong
    Mahdi, Ibrahim M.
    Dessouki, Abdelrahim Khalil
    Rashid, Ibrahim Abdel
    COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION, 2024, : 442 - 450
  • [50] Structural model of cost overrun factors affecting Pakistani construction projects
    Memon, Aftab Hameed
    Memon, Abdul Qadir
    Memon, Muneeb Ayub
    Sahito, Jam Shahzeb Khan
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2023, 42 (02) : 108 - 123