Process flow scheduling as a resource-constrained project planning problem

被引:0
|
作者
Trautmann, N [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtsch Theorie & Operat Res, Collegium Schloss 4, D-76128 Karlsruhe, Germany
关键词
D O I
暂无
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We discuss a project scheduling model for batch scheduling in process industries like chemicals or food industry. The production of Various final products out of different raw materials is achieved by several successive chemical or physical transformation processes on different production stages, e.g. heating, filtration, or packaging. In batch mode production, a given quantity of a substance, called batch, is processed at each production level using multi-purpose equipment. The complexity of the batch scheduling problem is increased by constraints as finite intermediate storage, minimal and maximal time lags that have to be considered between different production steps, sequence dependent cleaning operations, alternative modes for individual production steps, campaign scheduling etc. The objective is to determine a start time and a mode for each production step such that all constraints of the problem are observed and a given goal function is minimized. After an analysis of the problem and objective functions relevant in praxis, we present a deterministic resource-constrained project scheduling model and basic concepts of a solution algorithm.
引用
收藏
页码:491 / 496
页数:6
相关论文
共 50 条
  • [31] A survey of hybrid metaheuristics for the resource-constrained project scheduling problem
    Pellerin, Robert
    Perrier, Nathalie
    Berthaut, Francois
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 280 (02) : 395 - 416
  • [32] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [33] A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem
    Goncharov E.N.
    Journal of Applied and Industrial Mathematics, 2022, 16 (04) : 672 - 683
  • [34] A hybrid evolutionary algorithm for the resource-constrained project scheduling problem
    Thammano A.
    Phu-ang A.
    Artificial Life and Robotics, 2012, 17 (02) : 312 - 316
  • [35] A survey of variants and extensions of the resource-constrained project scheduling problem
    Hartmann, Soenke
    Briskorn, Dirk
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 1 - 14
  • [36] Proactive policies for the stochastic resource-constrained project scheduling problem
    Deblaere, Filip
    Demeulemeester, Erik
    Herroelen, Willy
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 214 (02) : 308 - 316
  • [37] An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem
    Huang, Zhiyu
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 8292 - 8297
  • [38] Best Insertion Algorithm for Resource-constrained Project Scheduling Problem
    Pesek, Igor
    Zerovnik, Janez
    KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, : 169 - 176
  • [39] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [40] A Boolean satisfiability approach to the resource-constrained project scheduling problem
    Andrei Horbach
    Annals of Operations Research, 2010, 181 : 89 - 107