The Henday Radisson Dorsey 500kV DC transmission line spacer damper rehabilitation project

被引:0
|
作者
Smith, GW
Mailey, S
机构
关键词
aeolian vibration; helicopters; HVDC transmission lines; measurement; quality control; spacer dampers; vibration control;
D O I
10.1109/TDCLLM.2003.1196470
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Manitoba Hydro (ME) was experiencing spacer damper failures on two +/- 500kV DC transmission lines and elected to refurbish all existing dampers and install additional dampers. The work was completed in a variable climate, over terrain that included over 400 kilometres (248 miles) of swamp and woodland accessible only by air and while lines remained energized to meet system requirements. The project included respacing dampers to improve damping capabilities, completing additional line maintenance, and the development of a mathematical model to check the veracity of damper placement records.
引用
收藏
页码:67 / 73
页数:7
相关论文
共 50 条
  • [21] Research on DC Ice-melting Technologies for 500kV AC Transmission Lines
    Hao, Weiwei
    Peng, Shurong
    Lu, Jiazheng
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 1663 - 1666
  • [22] Design of insulation dimension for ±500 kV DC gas insulated transmission line
    Jia, Zhijie
    Gan, Degang
    Li, Jing
    Dianwang Jishu/Power System Technology, 2011, 35 (08): : 192 - 196
  • [23] Safety Distance Analysis of 500kV Transmission Line Tower UAV Patrol Inspection
    Chen, De-Quan
    Guo, Xiang-Hua
    Huang, Po
    Li, Feng-Hang
    IEEE LETTERS ON ELECTROMAGNETIC COMPATIBILITY PRACTICE AND APPLICATIONS, 2020, 2 (04): : 124 - 128
  • [24] Switching Transient and Electrical Resonance Evaluation of 500kV Four Circuits Transmission Line
    Pramana, Putu Agus Aditya
    Kusuma, Aristo Adi
    Munir, Buyung Sofiarto
    Hendriyono, Devi
    2016 6TH INTERNATIONAL ANNUAL ENGINEERING SEMINAR (INAES), 2016, : 280 - 285
  • [25] Impact Assessment on the Ore Body under the Tower Footing of 500kV Transmission Line
    Zhang, Chen
    Yan, E'chuan
    Zhou, Yi
    Wang, Yajun
    ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 115 - +
  • [26] RELAY SETTING CONSIDERATIONS AND OPERATIONAL EXPERIENCE OF A LONG 500KV TRANSMISSION-LINE
    MUSTAPHI, KK
    ZIMERING, R
    IEEE TRANSACTIONS ON POWER DELIVERY, 1988, 3 (01) : 111 - 120
  • [27] Surface Charge Accumulation on 500kV Cone-Type GIS Spacer under Residual DC Voltage
    Zhou, Hong-yang
    Ma, Guo-ming
    Wang, Yuan
    Li, Cheng-rong
    Tu, You-Ping
    Ye, San-pai
    Zhang, Bo
    Guo, Xue-feng
    Yan, Xiang-lian
    IEEE TRANSACTIONS ON DIELECTRICS AND ELECTRICAL INSULATION, 2018, 25 (04) : 1230 - 1237
  • [28] Research on Electric Contact Calculation and Its Heat of 500kV Transmission Line Clamps
    Bao, Jiankang
    Wu, Guangning
    Gao, Bo
    2016 IEEE INTERNATIONAL CONFERENCE ON HIGH VOLTAGE ENGINEERING AND APPLICATION (ICHVE), 2016,
  • [29] Development of steel tower considered harmony with surrounding scenery for 500kV transmission line
    Hongo, E
    Urushibara, H
    Yamazaki, M
    Mikami, Y
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 992 - 997
  • [30] Optimization of the Surface Electric Field of Transmission Line Fitting On 500kv Line in High Altitude Area
    Li, Qin
    Jing, Wang
    Proceedings of the 2016 International Conference on Mechanics, Materials and Structural Engineering (ICMMSE), 2016, 29 : 203 - 208