共 50 条
- [41] A Proposal for the Improvement of Project's Cost Predictability using EVM and Historical Data of Cost PROCEEDINGS OF THE 35TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING (ICSE 2013), 2013, : 1447 - 1449
- [42] Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2017), 2017, 121 : 35 - 39
- [43] Consolidate Earned Value Principle with Integrated Cost Management - On Project Budget Control during Construction and Investment Period CALL OF PAPER PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2008, : 1181 - 1185
- [45] PROJECT COST ESTIMATE AT COMPLETION: EARNED VALUE MANAGEMENT VERSUS EARNED SCHEDULE-BASED REGRESSION MODELS. A COMPARATIVE ANALYSIS OF THE MODELS APPLICATION IN THE CONSTRUCTION PROJECTS IN ROMANIA ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2018, 52 (03): : 205 - 216
- [48] Study on the Cost Management of the Construction Project's Life Cycle 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1308 - 1310
- [50] Earned Scope Management: A Case of Study of Scope Performance using COSMIC (ISO 19761) with a Real Project PROCEEDINGS OF 2016 JOINT CONFERENCE OF THE INTERNATIONAL WORKSHOP ON SOFTWARE MEASUREMENT AND THE INTERNATIONAL CONFERENCE ON SOFTWARE PROCESS AND PRODUCT MEASUREMENT (IWSM-MENSURA), 2016, : 53 - 64