Using the Random Tree Classifier to Improve the Project's Cost Predictability in the Earned Value Management: An Empirical Study

被引:0
|
作者
Fernandes, Ana C. da S. [1 ]
de Souza, Adler Diniz [1 ]
机构
[1] Univ Fed Itajuba, Itajuba, MG, Brazil
关键词
D O I
10.1007/978-3-030-14070-0_83
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
引用
收藏
页码:589 / 592
页数:4
相关论文
共 50 条
  • [21] Predicting project duration and cost, and selecting the best action plan using statistical methods for earned value management
    Soltan, Sajad
    Ashrafi, Maryam
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (03) : 157 - 166
  • [22] Multivariate control charts using earned value and earned duration management observations to monitor project performance
    Votto, Rodrigo
    Ho, Linda Lee
    Berssaneti, Fernando
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 148
  • [23] Incorporating earned value management into income statements to improve project management profitability and elevate application in the business and management
    Setyopurnomo, Rudy
    Wiryono, Sudarso Kaderi
    Lestari, Yuliani Dwi
    Sukarno, Subiakto
    PLOS ONE, 2025, 20 (01):
  • [24] Using cost-risk to connect cost estimating and earned value management (EVM)
    Graham, David R.
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4663 - 4671
  • [25] A New Forecasting Model to Improve Earned Value Index to Achieve an Accurate Project Time and Cost Estimation
    Attarzadeh, Iman
    Hock, Ow Siew
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT AND ENGINEERING, PROCEEDINGS, 2009, : 317 - 321
  • [26] Setting tolerance limits for statistical project control using earned value management
    Colin, Jeroen
    Vanhoucke, Mario
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 49 : 107 - 122
  • [27] Dangers in using earned duration and other earned value metrics to measure a project's schedule performance
    Wendell, Richard E.
    Lowe, Timothy J.
    Gordon, Mike M.
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2023, 31 (02) : 665 - 680
  • [28] Dangers in using earned duration and other earned value metrics to measure a project’s schedule performance
    Richard E. Wendell
    Timothy J. Lowe
    Mike M. Gordon
    Central European Journal of Operations Research, 2023, 31 : 665 - 680
  • [29] Application of Earned Value Management System on an Infrastructure Project: A Malaysian Case Study
    Khamidi, Mohd Faris
    Ali, Waris
    Idrus, Arazi
    MANAGEMENT AND SERVICE SCIENCE, 2011, 8 : 1 - 5
  • [30] Enhancing project success: the impact of sociotechnical integration on project and program management using earned value management systems
    Aramali, Vartenie
    Gibson, George Edward
    Sanboskani, Hala
    El Asmar, Mounir
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2024, 17 (08) : 1 - 21