Using the Random Tree Classifier to Improve the Project's Cost Predictability in the Earned Value Management: An Empirical Study

被引:0
|
作者
Fernandes, Ana C. da S. [1 ]
de Souza, Adler Diniz [1 ]
机构
[1] Univ Fed Itajuba, Itajuba, MG, Brazil
关键词
D O I
10.1007/978-3-030-14070-0_83
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
引用
收藏
页码:589 / 592
页数:4
相关论文
共 50 条
  • [1] Using the Naive Bayes Classifier to Improve the Project's Cost Predictability in the Earned Value Management - An Empirical Study
    Fernandes, A. C. S.
    de Souza, Adler D.
    PROCEEDINGS OF THE 14TH BRAZILIAN SYMPOSIUM ON INFORMATION SYSTEMS (SBSI2018), 2018, : 278 - 284
  • [2] A Proposal for the Improvement of Project's Cost Predictability Using Earned Value Management and Historical Data of Cost - An Empirical Study
    de Souza, Adler Diniz
    Cavalcanti da Rocha, Ana Regina
    Silveira dos Santos, Djenane Cristina
    INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2015, 25 (01) : 27 - 50
  • [3] Using the Earned Value Management System to Improve Electrical Project Control
    Hanna, Awad S.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (03): : 449 - 457
  • [4] Implementation and Evaluation of Earned Value Index to Achieve an Accurate Project Time and Cost Estimation and Improve "Earned Value Management System"
    Attarzadeh, Iman
    Hock, Ow Siew
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT AND ENGINEERING, PROCEEDINGS, 2009, : 312 - 316
  • [5] Research on applications of the earned value management in the project cost management
    An, Yuhua
    Liu, Liqun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 973 - 978
  • [6] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [7] STUDY ON TARGET COST MANAGEMENT IN AERONAUTIC DEVELOPMENT PROJECT BASED ON EARNED VALUE METHOD
    Liu, Yigong
    Pan, Lixin
    Jin, Jing
    ICIM'2016: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2016, : 266 - 271
  • [8] Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost
    Batselier, Jordy
    Vanhoucke, Mario
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (11)
  • [9] A new formula to "Estimate At Completion" of a Project's time to improve "Earned Value Management System"
    Iranmanesh, H.
    Mojir, N.
    Kimiagari, S.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1014 - +
  • [10] Project cost forecasting based on earned value management and Markov chain
    Damavandi, Majid
    Tavakoli, Mahdieh
    Jolai, Fariborz
    ANNALS OF OPERATIONS RESEARCH, 2024,