Cost analysis and risk supervision of project in electric power construction

被引:0
|
作者
Gu Zheng [1 ]
Lu Tianqi [1 ]
Ma Qiang [1 ]
机构
[1] State Grid Liaoning Elect Power Co Ltd, Econ Res Inst, Shenyang 110000, Peoples R China
关键词
project cost; electric power construction; electric power enterprise; cost analysis; risk monitoring;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
At present, the project cost management of most electric power construction enterprises remains in the following way: the Finance Department will judge the surplus-deficit status of the engineering in accordance with the income from engineering settlement and actual cost of engineering and make evaluation after the completion of the engineering and end of settlement. As most construction projects of the electric power construction enterprise are such state-invested projects as power plant, more investment is required and the construction period is longer and it is harder to manage than that of general engineering projects. Therefore, the method for cost analysis and risk supervision of project in electric power construction is discussed in the Thesis. Firstly, analysis is made on the cost risk of engineering project and systematic and dynamic method is adopted for the comprehensive management of the cost risk of engineering project; secondly, as the quality of technical scheme for construction influences the construction cost, scientific and advanced technology is adopted during the construction to improve construction quality and speed up construction progress; finally, project management and risk management are implemented based on the cost control of engineering project to reduce cost and achieve the maximum economic benefits and social benefits of the engineering project.
引用
收藏
页码:1544 / 1547
页数:4
相关论文
共 50 条
  • [21] Discussion on the analysis of lifecycle cost for construction project
    Sun, LX
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 2176 - 2179
  • [22] Joint Analysis of the Power Generation Construction Project Schedule, Cost and Quality Based on DEA
    Sun, Hongfei
    Zhou, Lanping
    Wang, Yanyan
    MATERIALS SCIENCE AND MECHANICAL ENGINEERING, 2014, 467 : 282 - 286
  • [23] Analysis and impact of construction environment on the project cost
    Yang, Wenjun
    Dou, Zhi
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY, MANAGEMENT AND HUMANITIES SCIENCE (ETMHS 2015), 2015, 27 : 1005 - 1010
  • [25] Fuzzy Fault Tree Analysis of Power Project Safety Risk for the Smart Construction
    Yang Tai-hua
    Zheng Qing-hua
    Wang Yang
    Wang Su-fang
    2012 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 2012, : 372 - 376
  • [26] Development of an Integrated Cost, Time, Quality and Safety Risk Analysis Tool in a Construction Project
    Sudarsana, Dewa Ketut
    International Journal of COMADEM, 2023, 26 (03): : 3 - 8
  • [27] Analysis of risk factors in controlling cost of construction project and research on the corresponding management strategy
    Guan, J
    Duan, XM
    Ma, XG
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, 2004, : 235 - 237
  • [28] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation
    Zhong Zuowei
    Xi Bao
    Huang Qiugu
    Yang Shihua
    Li Fangzhen
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861
  • [29] Supervision games analysis on the project management model: Construction agent system
    Wei Jianguo
    Xian Yudan
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 625 - 627
  • [30] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857