Supervision games analysis on the project management model: Construction agent system

被引:0
|
作者
Wei Jianguo
Xian Yudan
机构
[1] Wuhan Univ Technol, Sch Econ, Wuhan, Peoples R China
[2] N China Univ Hydroelect Power, Zhengzhou, Peoples R China
关键词
construction agent system principal-agent mixed strategy; supervision game;
D O I
暂无
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
This paper analyzes two principal-agent relationships in construction agent system by applying game model and puts forward some suggestions. Firstly, construction agent system and principal-agent relationship in it are introduced. Secondly, this paper establishes a supervision game model between the owners and the PM companies and gets that the supervision game Nash equilibrium is related to the PM companies' added profit the forfeits, and the supervision cost. Thirdly, a supervision game model between the PM companies and the contractors is founded and obtains that the supervision game Nash equilibrium is related to the bribery; the added profit, the forfeit, and the supervision cost. Finally, it is suggested that the principals can constrain the agents' behaviors by efficient checking, evaluation and budget.
引用
收藏
页码:625 / 627
页数:3
相关论文
共 50 条
  • [1] Construction of Information System for Project Management in Major Sports Games
    Zhao, Lunan
    PROCEEDINGS OF SECOND INTERNATIONAL CONFERENCE ON SPORTS SCIENCE AND SPORTS ENGINEERING, 2009, : 145 - 150
  • [2] Study on the Construction of Information System for Project Management in Comprehensive Games
    Zhao, Lu-nan
    ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 1, PROCEEDINGS, 2009, : 212 - 215
  • [3] Supervision and Management Information System for Rural Drinking Water Project Construction
    Liu Zhenhua
    2013 THIRD INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM DESIGN AND ENGINEERING APPLICATIONS (ISDEA), 2013, : 1372 - 1375
  • [4] A Research on Risk Management of Agent Construction System of Engineering Project
    Gang, Li
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I & II, 2016, : 1157 - 1163
  • [5] Principal-Agent Model Analysis of Agent Construction for Expressway Project
    Tang Baiyuan
    Du Chengxiang
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2009, : 1012 - 1016
  • [6] An Analysis of Project Management of Intellectualized Construction System
    Gao Wei
    Sun Xucai
    PROCEEDINGS OF THE THIRD INTERNATIONAL SYMPOSIUM ON REGIONAL MANAGEMENT SCIENCE AND ENGINEERING, 2011, : 315 - 321
  • [7] The Research on System Model of Construction Materials Management by Project
    Yuan Dongliang
    Xu Delong
    Sai Yunxiu
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1667 - +
  • [8] Success model of project management information system in construction
    Lee, Seul-Ki
    Yu, Jung-Ho
    AUTOMATION IN CONSTRUCTION, 2012, 25 : 82 - 93
  • [9] A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    Carr, V
    Tah, JHM
    ADVANCES IN ENGINEERING SOFTWARE, 2001, 32 (10-11) : 847 - 857
  • [10] Study on system and structure for construction project management mutually model
    Dan, Wang
    Ying, Sun
    Zhongfu, Li
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 334 - 336