Bayesian degradation modelling for spare parts inventory management

被引:4
|
作者
Ruiz, Cesar [1 ]
Pohl, Edward [1 ]
Liao, Haitao [1 ]
机构
[1] Univ Arkansas, Dept Ind Engn, Fayetteville, AR 72701 USA
关键词
Bayesian degradation modelling; stochastic dynamic programming; spare parts inventory management; PROVISIONING POLICY; JOINT OPTIMIZATION; MAINTENANCE; REPLACEMENT; INFORMATION;
D O I
10.1093/imaman/dpaa008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Decision makers in various sectors, such as manufacturing and transportation, strive to minimize downtime costs. Often, brief-planned stoppage times allow for changes in shifts and line configurations and longer periods are scheduled for major repairs. It is quite important to proactively make use of these downtimes to reduce the costs of unexpected downtimes due to failures. Among many aspects, the availability of spare parts significantly affects the operational costs of such systems. Current sensor technologies enable the condition monitoring of critical components and degradation-based spare parts management. This paper focuses on Bayesian degradation modelling for spare parts inventory management for a new system. We propose a stochastic dynamic program to minimize the expected spare parts inventory cost for a fixed planning horizon. A numerical example illustrates the value of Bayesian analysis in this management setting. The proposed methodology finds the optimal time between long stoppages and optimal spare parts order quantity when the prior information about the degradation process is accurate. The methodology can be used to analyse the sensitivity of the optimal solution to changes in the accuracy and bias of the prior distributions of the model parameters, the cost structure and the number of machines in the system.
引用
收藏
页码:31 / 49
页数:19
相关论文
共 50 条
  • [31] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [32] Research on classified management methods for spare parts inventory of productive enterprises
    He, Qichao
    Wang, Naiqi
    Xu, Taiheng
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT LOGISTICS SYSTEMS, 2008, : 437 - 441
  • [33] APPLICATION OF CLASSICAL INVENTORY ANALYSIS TO A SPARE PARTS INVENTORY
    FLOWERS, AD
    ONEILL, JB
    INTERFACES, 1978, 8 (02) : 76 - 78
  • [34] A COMPUTER-BASED INVENTORY MANAGEMENT-SYSTEM FOR SPARE PARTS
    NAGARUR, NN
    HU, TS
    BAID, NK
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 1994, 94 (09) : 22 - 28
  • [35] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    Reliability Engineering and System Safety, 2022, 219
  • [36] Spare parts inventory management: New evidence from distribution fitting
    Turrini, Laura
    Meissner, Joern
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (01) : 118 - 130
  • [37] Stochastic mixed-integer programming for a spare parts inventory management problem
    Johannsmann, Leonie M.
    Craparo, Emily M.
    Dieken, Thor L.
    Fugenschuh, Armin R.
    Seitner, Bjoern O.
    COMPUTERS & OPERATIONS RESEARCH, 2022, 138
  • [38] Condition-based critical level policy for spare parts inventory management
    Dendauw, Pieterjan
    Goeman, Thomas
    Claeys, Dieter
    De Turck, Koen
    Fiems, Dieter
    Bruneel, Herwig
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157
  • [39] Conceptual Approach for Integrating Tactical Spare Parts Inventory Management and Transport Planning
    Cordes, Ann-Kristin
    Hellingrath, Bernd
    2014 12TH IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS (INDIN), 2014, : 548 - 553
  • [40] Inventory Management Model of Metro Vehicle Repairable Spare Parts Based On METRIC
    Zang, Yao
    Gao, Jindong
    Xing, Zongyi
    Long, Jing
    PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 2956 - 2960