Critical project planning and spare parts inventory management in shutdown maintenance

被引:1
|
作者
Zhu, Sha [1 ]
van Jaarsveld, Willem [2 ]
Dekker, Rommert [3 ]
机构
[1] Department of Information & Organizations Management, ESCP Paris, 3 Rue Armand Moisant, Paris,75015, France
[2] Industrial Engineering & Innovation Sciences, Technische Universiteit Eindhoven, P.O. Box 513, Eindhoven,5600 MB, Netherlands
[3] Econometric Institute, Erasmus University Rotterdam, P.O. Box 1738, DR, Rotterdam,3000, Netherlands
关键词
Importance sampling - Costs - Economic and social effects - Heuristic methods - Plant shutdowns - Stochastic programming - Project management - Inventory control;
D O I
暂无
中图分类号
学科分类号
摘要
In the process industry, plant production is completely halted every so many years for large-scale maintenance comprising inspection, repair and overhaul. It is paramount that this shutdown maintenance is completed according to the planning, which requires timely availability of replacement parts. In this setting, we present a spare parts optimization model and algorithm that includes the cost-time trade-off and precedence constraints between maintenance activities. The objective is to balance between spare parts ordering cost and the expected project delay cost due to waiting for spare parts. Using two-stage stochastic programming, spare parts ordering policies are determined in the first stage and a detailed project schedule is developed in the second stage. We propose a sample average approximation with importance sampling and pruning of dominated activities to solve the problem, and demonstrate that this method solves large instances quickly. We also consider heuristics, e.g. the standard project management approach based on the widely used critical path method and two heuristics that draw from spare part inventory control literature. These heuristics give poor solutions. © 2021 Elsevier Ltd
引用
收藏
相关论文
共 50 条
  • [1] Critical project planning and spare parts inventory management in shutdown maintenance
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 219
  • [2] Spare parts inventory control based on maintenance planning
    Zhu, Sha
    van Jaarsveld, Willem
    Dekker, Rommert
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193
  • [3] A METHOD OF SPARE PARTS INVENTORY PLANNING
    BARTAKKE, MN
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1981, 9 (01): : 51 - 58
  • [4] Building inventory management system by using stochastic inventory model for critical spare parts used for maintenance of construction machines
    Kasap, Nihat
    Bicer, Ilker
    Ozkaya, Banu Yuksel
    ISTANBUL UNIVERSITY JOURNAL OF THE SCHOOL OF BUSINESS, 2010, 39 (02): : 310 - 334
  • [5] The value of maintenance delay flexibility for improved spare parts inventory management
    Basten, Rob J., I
    Ryan, Jennifer K.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 278 (02) : 646 - 657
  • [6] Spare parts inventory control for the maintenance of productive plants
    Bevilacqua, M.
    Clarapica, F. E.
    Giacchetta, G.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1380 - 1384
  • [7] NUMBERING SYSTEM SIMPLIFIES MAINTENANCE SPARE PARTS INVENTORY
    LONG, G
    PLANT ENGINEERING, 1979, 33 (06) : 137 - 140
  • [8] Conceptual Approach for Integrating Tactical Spare Parts Inventory Management and Transport Planning
    Cordes, Ann-Kristin
    Hellingrath, Bernd
    2014 12TH IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL INFORMATICS (INDIN), 2014, : 548 - 553
  • [9] Condition-based critical level policy for spare parts inventory management
    Dendauw, Pieterjan
    Goeman, Thomas
    Claeys, Dieter
    De Turck, Koen
    Fiems, Dieter
    Bruneel, Herwig
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157
  • [10] SELECTED ASPECTS OF SPARE PARTS INVENTORY MANAGEMENT
    Jurczyk, Krzysztof
    Karkula, Marek
    CLC 2013: CARPATHIAN LOGISTICS CONGRESS - CONGRESS PROCEEDINGS, 2014, : 318 - 323