An interval chance-constrained programming-based optimization model for carbon capture, utilization, and storage system planning

被引:12
|
作者
Zhai, Mingyang [1 ]
Jia, Haifeng [1 ]
Yin, Dingkun [1 ]
机构
[1] Tsinghua Univ, Sch Environm, Beijing 100084, Peoples R China
关键词
Carbon capture; utilization; and storage; CO2; compression; Enhanced oil recovery; Interval linear programming; Chance-constrained programming; Uncertainties; AIR-QUALITY MANAGEMENT; CO2; CAPTURE; TRANSPORT; FRAMEWORK; CCUS;
D O I
10.1016/j.scitotenv.2021.145560
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon capture, utilization, and storage (CCUS) are widely regarded as a crucial technological option for industrial large-scale carbon dioxide (CO2) emissions reduction. However, high-cost and uncertainties hinder the widespread application of CCUS technology. In this study, an interval-chance-constrained programming-based optimization model was proposed to address random probability distributions, interval values, complex interactions, and the dynamics of capacity expansion issues. The model was applied to a CCUS project in China. A set of violation probability levels (0.01, 0.05, 0.1, and 0.2) were designed to reflect system costs and risk levels. And then the solutions for system costs, capacity expansion, and operating schemes under four violation probability levels (p(i')) could be generated. The results revealed that the model could ensure the highest reliability and largest CO2 storage under p(i') = 0.01. At this probability level, the amount of CO2 storage would range from 4972.05-5429.75 kilotons per annum (ktpa), the CCUS system cost would be highest at $166.57 million, and the net system benefits would be slightly less at $105.91 million. If policymakers strive to achieve the net system benefits of the project, the highest net system benefits would be achieved under p(i') = 0.05. At this probability level, the net system benefits would increase to $135.45 million, the system cost would reduce to 5138.62 million, but the total amount of CO2 storage would decrease to between 4090.01 and 4653.24 ktpa, which would entail a high risk of system violation. These findings enable policymakers to determine the trade-offs among system reliability, CO2 reduction, and the benefits of the project. The modeling approach can also address interactions among CCUS activities and the dynamics of facility expansion issues as well as help policymakers develop adaptive operational strategies. This study enriches CCUS research through an interval chance-constrained optimization modeling approach for CCUS system management under multiple uncertainties. (C) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Day-Ahead Optimal Scheduling of Integrated Energy System Based on Type-II Fuzzy Interval Chance-Constrained Programming
    Sun, Xinyu
    Wu, Hao
    Guo, Siqi
    Zheng, Lingwei
    ENERGIES, 2022, 15 (18)
  • [42] An interval multistage joint-probabilistic chance-constrained programming model with left-hand-side randomness for crop area planning under uncertainty
    Zhang, Chenglong
    Li, Mo
    Guo, Ping
    JOURNAL OF CLEANER PRODUCTION, 2017, 167 : 1276 - 1289
  • [43] Solving for Power system economic dispatch with wind power integration based on chance-constrained programming
    Ren, Yaming
    2019 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT INFORMATION PROCESSING (ICIIP 2019), 2019, : 107 - 110
  • [44] A NEW UNCERTAIN TWO-STAGE NETWORK DEA MODEL BASED ON CHANCE-CONSTRAINED PROGRAMMING
    Yang, Sijia
    Yang, Xiangfeng
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2024, 21 (03) : 2032 - 2051
  • [45] Optimization of distribution network maintenance scheduling based on fuzzy chance-constrained bi-level programming
    Xu, Xufeng
    Huang, Minxiang
    Wang, Tingting
    Qiu, Jiaju
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2010, 25 (03): : 157 - 163
  • [46] Two-stage chance-constrained programming based on Gaussian mixture model and piecewise linear decision rule for refinery optimization
    Yang, Yu
    COMPUTERS & CHEMICAL ENGINEERING, 2024, 184
  • [47] Stochastic optimization model for the short-term joint operation of photovoltaic power and hydropower plants based on chance-constrained programming
    Yuan, Wenlin
    Wang, Xinqi
    Su, Chengguo
    Cheng, Chuntian
    Liu, Zhe
    Wu, Zening
    ENERGY, 2021, 222
  • [48] Power network-planning optimization considering average power not supplied reliability index: Modified by chance-constrained programming
    Ghayoor, Fatemeh
    Ghannadpour, Seyed Farid
    Zaboli, Aydin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 164
  • [49] A Chance-Constrained Interval-Inexact Energy Systems Planning Model (CCIESM) for City B based on Power Demand Probabilistic Forecasting
    Wang, Zongwu
    Huang, Guohe
    Niu, Yantao
    MATERIALS PROCESSING AND MANUFACTURING III, PTS 1-4, 2013, 753-755 : 1891 - 1902
  • [50] Joint Planning of Distributed PV Stations and EV Charging Stations in the Distribution Systems Based on Chance-Constrained Programming
    Zhang, Xinsong
    Xu, Yangyang
    Lu, Shengnan
    Lu, Cheng
    Guo, Yunxiang
    IEEE ACCESS, 2021, 9 : 6756 - 6768