An interval chance-constrained programming-based optimization model for carbon capture, utilization, and storage system planning

被引:12
|
作者
Zhai, Mingyang [1 ]
Jia, Haifeng [1 ]
Yin, Dingkun [1 ]
机构
[1] Tsinghua Univ, Sch Environm, Beijing 100084, Peoples R China
关键词
Carbon capture; utilization; and storage; CO2; compression; Enhanced oil recovery; Interval linear programming; Chance-constrained programming; Uncertainties; AIR-QUALITY MANAGEMENT; CO2; CAPTURE; TRANSPORT; FRAMEWORK; CCUS;
D O I
10.1016/j.scitotenv.2021.145560
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Carbon capture, utilization, and storage (CCUS) are widely regarded as a crucial technological option for industrial large-scale carbon dioxide (CO2) emissions reduction. However, high-cost and uncertainties hinder the widespread application of CCUS technology. In this study, an interval-chance-constrained programming-based optimization model was proposed to address random probability distributions, interval values, complex interactions, and the dynamics of capacity expansion issues. The model was applied to a CCUS project in China. A set of violation probability levels (0.01, 0.05, 0.1, and 0.2) were designed to reflect system costs and risk levels. And then the solutions for system costs, capacity expansion, and operating schemes under four violation probability levels (p(i')) could be generated. The results revealed that the model could ensure the highest reliability and largest CO2 storage under p(i') = 0.01. At this probability level, the amount of CO2 storage would range from 4972.05-5429.75 kilotons per annum (ktpa), the CCUS system cost would be highest at $166.57 million, and the net system benefits would be slightly less at $105.91 million. If policymakers strive to achieve the net system benefits of the project, the highest net system benefits would be achieved under p(i') = 0.05. At this probability level, the net system benefits would increase to $135.45 million, the system cost would reduce to 5138.62 million, but the total amount of CO2 storage would decrease to between 4090.01 and 4653.24 ktpa, which would entail a high risk of system violation. These findings enable policymakers to determine the trade-offs among system reliability, CO2 reduction, and the benefits of the project. The modeling approach can also address interactions among CCUS activities and the dynamics of facility expansion issues as well as help policymakers develop adaptive operational strategies. This study enriches CCUS research through an interval chance-constrained optimization modeling approach for CCUS system management under multiple uncertainties. (C) 2021 Elsevier B.V. All rights reserved.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Fuzzy Bi-objective Chance-Constrained Programming Model for Timetable Optimization of a Bus Route
    Du, Hejia
    Ma, Hongguang
    Li, Xiang
    ADVANCES IN COMPUTATIONAL INTELLIGENCE SYSTEMS, 2018, 650 : 312 - 324
  • [22] An optimization model for regional micro-grid system management based on hybrid inexact stochastic-fuzzy chance-constrained programming
    Ji, L.
    Niu, D. X.
    Xu, M.
    Huang, G. H.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 64 : 1025 - 1039
  • [23] A copula-based fuzzy chance-constrained programming model and its application to electric power generation systems planning
    Chen, F.
    Huang, G. H.
    Fan, Y. R.
    Chen, J. P.
    APPLIED ENERGY, 2017, 187 : 291 - 309
  • [24] Configuration Planning of Expressway Self-Consistent Energy System Based on Multi-Objective Chance-Constrained Programming
    Huang, Xian
    Ji, Wentong
    Ye, Xiaorong
    Feng, Zhangjie
    SUSTAINABILITY, 2023, 15 (06)
  • [25] Community-scale renewable energy systems planning under uncertainty-An interval chance-constrained programming approach
    Cai, Y. P.
    Huang, G. H.
    Yang, Z. F.
    Lin, Q. G.
    Tan, Q.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (04): : 721 - 735
  • [26] Optimization of transmission line maintenance scheduling based on chance-constrained bi-level programming
    Xu, Xufeng
    Huang, Minxiang
    Wang, Tingting
    Qiu, Jiaju
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2009, 33 (02): : 25 - 29
  • [27] A type-2 fuzzy chance-constrained programming method for planning Shanghai's energy system
    Suo, C.
    Li, Y. P.
    Wang, C. X.
    Yu, L.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2017, 90 : 37 - 53
  • [28] A Chance-Constrained Economic Dispatch Model in Wind-Thermal-Energy Storage System
    Hu, Yanzhe
    Li, Yang
    Xu, Mengjie
    Zhou, Li
    Cui, Mingjian
    ENERGIES, 2017, 10 (03)
  • [29] Power System Day-Ahead Unit Commitment Based on Chance-Constrained Dependent Chance Goal Programming
    Li, Zhiwei
    Jin, Tianran
    Zhao, Shuqiang
    Liu, Jinshan
    ENERGIES, 2018, 11 (07):
  • [30] Chance-constrained Programming Based Congestion Dispatching Optimization of Power System with Large-scale Wind Power Integration
    Wang Z.
    Lou S.
    Fan Z.
    Wu Y.
    Yang Y.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (23): : 147 - 154