identical machine scheduling;
minimizing number of tardy jobs;
lot-splitting;
D O I:
10.1016/S0360-8352(97)00092-2
中图分类号:
TP39 [计算机的应用];
学科分类号:
081203 ;
0835 ;
摘要:
In this paper, minimizing the number of tardy jobs in identical parallel machine scheduling is discussed. Four mathematical modeling formulations are presented to consider setup times and lot-splitting decisions. The results of the experimentation are presented and concluding remarks are made. (C) 1997 Elsevier Science Ltd.
机构:
Shenyang Normal Univ Shenyang, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R ChinaShenyang Normal Univ Shenyang, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R China
Zhao, Chuanli
Hsu, Chou-Jung
论文数: 0引用数: 0
h-index: 0
机构:
Nan Kai Univ Technol, Dept Ind Engn & Management, Nantou, TaiwanShenyang Normal Univ Shenyang, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R China
Hsu, Chou-Jung
Cheng, Shuenn-Ren
论文数: 0引用数: 0
h-index: 0
机构:
Cheng Shiu Univ, Grad Inst Business Adm, Kaohsiung, Kaohsiung Cty, TaiwanShenyang Normal Univ Shenyang, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R China
Cheng, Shuenn-Ren
Yin, Yunqiang
论文数: 0引用数: 0
h-index: 0
机构:
Kunming Univ Sci & Technol, Fac Sci, Kunming 650093, Peoples R ChinaShenyang Normal Univ Shenyang, Sch Math & Syst Sci, Shenyang 110034, Liaoning, Peoples R China
机构:
Shanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200052, Peoples R China
Shenzhen Univ, Coll Management, Shenzhen 518060, Peoples R ChinaShanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200052, Peoples R China
Wan, Guohua
Yen, Benjamin P. -C.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Hong Kong, Sch Business, Hong Kong, Hong Kong, Peoples R ChinaShanghai Jiao Tong Univ, Antai Coll Econ & Management, Shanghai 200052, Peoples R China