共 50 条
- [21] One machine scheduling to minimize the maximum earliness with minimum number of tardy jobs Int J Prod Econ, 2 (213-219):
- [27] Heuristic procedure to minimize number of tardy jobs and total tardiness in single machine scheduling Computers and Industrial Engineering, 1992, 23 (1-4): : 145 - 148
- [28] Optimal operator assignment and cell loading when lot-splitting is allowed Computers and Industrial Engineering, 1998, 35 (3-4): : 431 - 434
- [29] Uniform parallel-machine scheduling to minimize the number of tardy jobs in the MapReduce system PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 124 - 129