A MODEL FOR EVALUATING THE RISK EFFECTS ON CONSTRUCTION PROJECT ACTIVITIES

被引:10
|
作者
Issa, Usama Hamed [1 ,2 ]
Mosaad, Salah Attia [3 ,4 ]
Hassan, Mohamed Salah [4 ]
机构
[1] Taif Univ, Dept Civil Engn, Coll Engn, At Taif, Saudi Arabia
[2] Menia Univ, Fac Engn, Dept Civil Engn, Al Minya, Egypt
[3] Jabal Omar Dev Co, Project Management Div, Mecca, Saudi Arabia
[4] Menia Univ, Dept Mech Power & Energy, Fac Engn, Al Minya, Egypt
关键词
construction project activities; evaluating risks; cost overruns; time delays; risk analysis;
D O I
10.3846/jcem.2019.10531
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost overruns and time delays are considered to be very important challenges for the majority of construction projects. These challenges are typically attributed to their associated risks. Due to the risky and uncertain nature of construction projects, an increasing amount of attention is given to estimating and overcoming cost overruns and time delays. New techniques are being developed to help project managers to contractually complete projects within cost and time constraints. The objective of this study was to develop a new qualitative and quantitative risk analysis model that can be employed for construction projects. The proposed model, which is based on a fuzzy logic tool, consists of two modules for assessing risk factors that affect the main construction activities and computing the expected cost overruns and time delays that are associated with these risks. Using numerous logical rules, the model applies the probability of occurrences and impacts of the risks on the cost and time of the main activities. The Spearman and Kendall correlation coefficient tests are applied to verify and select a suitable membership function. Using four proposed membership functions, the results of these tests confirmed that the triangle membership function is suitable for the model. The model is verified by application to HVAC system activities in two actual construction projects, which serve as case studies. Two different methods are proposed and applied to quantify the cost overruns and time delays. The first method is based on determining the cost overruns and time delay values for each activity according to their weight in the system. Triple premise rules are proposed and applied in the second method, which is established to relate all activities. The results from the second method are more accurate compared with the first method based on actual data from the case study projects. In addition, the results demonstrated that the proposed model can be used to quantify the expected cost overrun and time delays in construction project activities and can be generalized and implemented in different construction activities.
引用
收藏
页码:687 / 699
页数:13
相关论文
共 50 条
  • [1] Construction Project Risk Assessment Model
    Zhang Su-xian
    Li Xiao-li
    PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 42 - 45
  • [2] Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model
    Nasir, D
    McCabe, B
    Hartono, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (05): : 518 - 527
  • [3] Extended risk-analysis model for activities of the project
    Kusar, Janez
    Rihar, Lidija
    Zargi, Urban
    Starbek, Marko
    SPRINGERPLUS, 2013, 2 : 1 - 12
  • [4] A Model on Risk Identification of Construction Project Based on the Process
    Zhang Suxian
    Yang Ruili
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 354 - 359
  • [5] The Multilevel Gray Incidence Model for Construction Project Risk
    Wang Xiao
    Shuai Ning
    MOT2009: PROCEEDINGS OF ZHENGZHOU CONFERENCE ON MANAGEMENT OF TECHNOLOGY, VOLS I AND II, 2009, : 365 - 368
  • [6] Study on Construction Project Financing Risk Assessment Model
    Ma, Xin
    Li, Huimin
    Su, Chuanchuan
    Li, Panwu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 787 - 790
  • [7] Study on Construction Project Bidding Risk Assessment Model
    Wen Guo-feng
    Chen Li-wen
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 210 - 214
  • [8] RETRACTED: Evaluating Indexes of Risk Level in Construction Project by Fuzzy Matter-element Model (Retracted Article)
    Hui, Liu
    2011 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL SCIENCE-ICEES 2011, 2011, 11
  • [9] Model for evaluating uncertain project duration considering construction interface problems
    Wang, Shih-Hsu
    Lai, Yu-Ting
    Liu, Jang-Jeng
    Wang, Wei-Chih
    APPLIED SCIENCE AND PRECISION ENGINEERING INNOVATION, PTS 1 AND 2, 2014, 479-480 : 1160 - +
  • [10] Evaluating Levels of Project Planning and their Effects on Performance in the Nigerian Construction Industry
    Idoro, Godwin
    CONSTRUCTION ECONOMICS AND BUILDING, 2009, 9 (02): : 39 - 50