Assessing the Impacts of an IT LPS Support System on Schedule Accomplishment in Construction Projects

被引:14
|
作者
Ignacio Lagos, Camilo [1 ]
Fernando Herrera, Rodrigo [1 ,2 ,3 ]
Fernando Alarcon, Luis [1 ]
机构
[1] Pontificia Univ Catolica Chile, Prod Management Ctr, Santiago 4860, Chile
[2] Pontificia Univ Catolica Valparaiso, Sch Civil Engn, Valparaiso 23662804, Chile
[3] Univ Politecn Valencia, Camino Vera S-N, E-46022 Valencia, Spain
关键词
Last Planner System; Information technologies; Implementation level; Project performance; Schedule accomplishment;
D O I
10.1061/(ASCE)CO.1943-7862.0001691
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper seeks to identify improvements in the level of implementation of the Last Planner System (LPS) with the use of information technologies (IT) based on its methodology. In addition, we correlate the level of implementation of specific LPS components to the plan percent complete (PPC). The conjoint analysis of IT benefits in implementation and correlation to PPC allowed identification of two critical components: the standardization of the planning and control process, which can be quantitatively assessed by the PPC, and the systematic analysis and removal of constraints assessed through the percentage of constraints removed (PCR). A sample of 50 projects was used to corroborate that projects that have higher PPC and PCR also have better performance, measured by the schedule accomplishment and number of noncompliances. Consequently, results inferred that projects that use IT systems based on LPS have a more systematic planning and control and better constraint management that also correspond to better schedule accomplishment and less noncompliance.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] MULTIPLE CRITERIA DECISION SUPPORT SYSTEM FOR ASSESSMENT OF PROJECTS MANAGERS IN CONSTRUCTION
    Zavadskas, Edmundas Kazimieras
    Vainiunas, Povilas
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2012, 11 (02) : 501 - 520
  • [32] Integrated Decision Support Framework of Optimal Scaffolding System for Construction Projects
    Jin, Haifeng
    Goodrum, Paul M.
    ALGORITHMS, 2023, 16 (07)
  • [33] A Decision Support System for Construction Projects Based on Standardized Exchanged Documents
    马智亮
    陆宁
    顾卫华
    Tsinghua Science and Technology, 2008, (S1) : 354 - 361
  • [34] A CBR-based support system of quick construction projects bids
    Bao, YK
    Liu, Z
    Zhang, JL
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 2991 - 2995
  • [35] WORKFORCE INFORMATION DATABASE SYSTEM TO SUPPORT PRODUCTION PLANNING IN CONSTRUCTION PROJECTS
    Kim, Sang-Chul
    Kim, Yong-Woo
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (06) : 867 - 878
  • [36] MATHEMATICS AS SUPPORT IN THE CONSTRUCTION OF TECHNOLOGICAL PROJECTS
    Robles, Angelica
    TELEMATIQUE, 2022, 21 (02): : 37 - 45
  • [37] Developing a new sustainable rating system for assessing construction projects using BWM
    Alsharkawy, Mahmoud
    Hamdy, Ahmed
    Marzouk, Mohamed
    CLEANER ENGINEERING AND TECHNOLOGY, 2025, 25
  • [38] Cost escalation and schedule delays in road construction projects in Zambia
    Kaliba, Chabota
    Muya, Mundia
    Mumba, Kanyuka
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (05) : 522 - 531
  • [39] Crashing construction projects considering schedule flexibility: an illustrative example
    Turkoglu, Harun
    Polat, Gul
    Akin, Firat Dogu
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (04) : 619 - 628
  • [40] APPLICATION OF CONSTRUCTION SCHEDULE FOR MONITORING AND CONTROL OF CIVIL ENGENEERING PROJECTS
    Danijela, Stanojlovic
    ARCHIVES FOR TECHNICAL SCIENCES, 2015, (12): : 51 - 58