Assessing the Impacts of an IT LPS Support System on Schedule Accomplishment in Construction Projects

被引:14
|
作者
Ignacio Lagos, Camilo [1 ]
Fernando Herrera, Rodrigo [1 ,2 ,3 ]
Fernando Alarcon, Luis [1 ]
机构
[1] Pontificia Univ Catolica Chile, Prod Management Ctr, Santiago 4860, Chile
[2] Pontificia Univ Catolica Valparaiso, Sch Civil Engn, Valparaiso 23662804, Chile
[3] Univ Politecn Valencia, Camino Vera S-N, E-46022 Valencia, Spain
关键词
Last Planner System; Information technologies; Implementation level; Project performance; Schedule accomplishment;
D O I
10.1061/(ASCE)CO.1943-7862.0001691
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper seeks to identify improvements in the level of implementation of the Last Planner System (LPS) with the use of information technologies (IT) based on its methodology. In addition, we correlate the level of implementation of specific LPS components to the plan percent complete (PPC). The conjoint analysis of IT benefits in implementation and correlation to PPC allowed identification of two critical components: the standardization of the planning and control process, which can be quantitatively assessed by the PPC, and the systematic analysis and removal of constraints assessed through the percentage of constraints removed (PCR). A sample of 50 projects was used to corroborate that projects that have higher PPC and PCR also have better performance, measured by the schedule accomplishment and number of noncompliances. Consequently, results inferred that projects that use IT systems based on LPS have a more systematic planning and control and better constraint management that also correspond to better schedule accomplishment and less noncompliance.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Integrated Schedule Information Model for Airport Construction Projects
    Jia, Guangshe
    Xue, Xiangdong
    Cao, Li
    Chen, Jianguo
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, 2008, : 71 - 77
  • [22] Detection of schedule delay risk of empirical construction projects
    Gebrehiwet, Tsegay
    Luo, Hanbin
    FRONTIERS OF ENGINEERING MANAGEMENT, 2018, 5 (02) : 251 - 267
  • [23] Detection of schedule delay risk of empirical construction projects
    Tsegay GEBREHIWET
    Hanbin LUO
    Frontiers of Engineering Management, 2018, (02) : 251 - 267
  • [24] Understanding Construction Projects' Schedule Overruns in South Africa
    Mukuka, Mulenga
    Aigbavboa, Clinton
    Thwala, Wellington
    ICCREM 2015: ENVIRONMENT AND THE SUSTAINABLE BUILDING, 2015, : 591 - 602
  • [25] Probability distribution fitting of schedule overruns in construction projects
    Love, P. E. D.
    Sing, C-P
    Wang, X.
    Edwards, D. J.
    Odeyinka, H.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (08) : 1231 - 1247
  • [26] Empirical study of schedule delay in Moroccan construction projects
    Bajjou, Mohamed Saad
    Chafi, Anas
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 783 - 800
  • [27] Detection of schedule delay risk of empirical construction projects
    Tsegay GEBREHIWET
    Hanbin LUO
    Frontiers of Engineering Management, 2018, 5 (02) : 251 - 267
  • [28] A SYSTEM TO KEEP PROJECTS ON BUDGET, ON SCHEDULE
    BURSTEIN, D
    CONSULTING ENGINEER, 1983, 61 (01): : 69 - 72
  • [29] A framework for assessing sustainability of construction projects
    Salah, Menna
    Elmasry, Mohamed
    Mashhour, Ibrahim M.
    Amer, Nabil
    CLEANER ENGINEERING AND TECHNOLOGY, 2023, 13
  • [30] ROLE OF SPATIAL RELATIONSHIPS IN ASSESSING SOCIAL AND ECONOMIC IMPACTS OF LARGE-SCALE CONSTRUCTION PROJECTS
    CHALMERS, JA
    NATURAL RESOURCES JOURNAL, 1977, 17 (02) : 209 - 222