Three-stage optimization method for the problem of scheduling additional trains on a high-speed rail corridor

被引:43
|
作者
Gao, Yuan [1 ]
Kroon, Leo [2 ,3 ]
Yang, Lixing [1 ]
Gao, Ziyou [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
[3] Netherlands Railways, Proc Qual & Innovat, NL-3500 HA Utrecht, Netherlands
基金
中国国家自然科学基金;
关键词
Train timetabling problem; Additional trains; High-speed rail; Optimization; ALGORITHMS; MODEL;
D O I
10.1016/j.omega.2017.08.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
When scheduling additional trains into a busy timetable, the arrival and departure times of existing trains may have to be adjusted. Taking a high-speed rail corridor as the research object, we formulate a bi-objective mixed integer linear programming model to generate a new timetable for both of the additional trains and the existing trains, which minimizes the total travel time of the additional trains and minimizes the adjustment on the existing trains at the same time. In order to better model the operations of trains on the high-speed rail line, the capacities of the stations and the acceleration/deceleration times are all taken into account Furthermore, we propose a three-stage optimization method to solve the bi-objective model. Based on the real data of the Hangzhou-Ningbo-Wenzhou high-speed rail corridor in China, computational experiments are carried out to test the proposed model and optimization method. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:175 / 191
页数:17
相关论文
共 50 条