Three-stage optimization method for the problem of scheduling additional trains on a high-speed rail corridor

被引:43
|
作者
Gao, Yuan [1 ]
Kroon, Leo [2 ,3 ]
Yang, Lixing [1 ]
Gao, Ziyou [1 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
[3] Netherlands Railways, Proc Qual & Innovat, NL-3500 HA Utrecht, Netherlands
基金
中国国家自然科学基金;
关键词
Train timetabling problem; Additional trains; High-speed rail; Optimization; ALGORITHMS; MODEL;
D O I
10.1016/j.omega.2017.08.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
When scheduling additional trains into a busy timetable, the arrival and departure times of existing trains may have to be adjusted. Taking a high-speed rail corridor as the research object, we formulate a bi-objective mixed integer linear programming model to generate a new timetable for both of the additional trains and the existing trains, which minimizes the total travel time of the additional trains and minimizes the adjustment on the existing trains at the same time. In order to better model the operations of trains on the high-speed rail line, the capacities of the stations and the acceleration/deceleration times are all taken into account Furthermore, we propose a three-stage optimization method to solve the bi-objective model. Based on the real data of the Hangzhou-Ningbo-Wenzhou high-speed rail corridor in China, computational experiments are carried out to test the proposed model and optimization method. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:175 / 191
页数:17
相关论文
共 50 条
  • [21] Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem
    Komaki, G. M.
    Teymourian, Ehsan
    Kayvanfar, Vahid
    Booyavi, Zahra
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 105 : 158 - 173
  • [22] Aerodynamic shape optimization of high-speed trains
    Krajnović, S.
    Helgason, E.
    Hafsteinsson, H.E.
    Civil-Comp Proceedings, 2012, 98
  • [23] Research on Prediction of High-Speed Rail Trains Delay Time
    Shi, Jing
    Peng, Qiyuan
    Liu, Ling
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 2129 - 2141
  • [24] Optimization of Wheel Profiles for High-speed Trains
    Qi, Yayun
    Dai, Huanyun
    Gan, Feng
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2022, 58 (24): : 188 - 197
  • [25] Propagation Experiment on Millimeter Wave for High-speed Rail Trains
    Hattori, Tetsunori
    Kudo, Tsukasa
    2016 IEEE 27TH ANNUAL INTERNATIONAL SYMPOSIUM ON PERSONAL, INDOOR, AND MOBILE RADIO COMMUNICATIONS (PIMRC), 2016, : 1077 - 1082
  • [26] Compensation strategy for high-speed three-stage switched-capacitor amplifiers
    Giustolisi, G.
    Palumbo, G.
    ELECTRONICS LETTERS, 2016, 52 (14) : 1202 - 1203
  • [27] Critical speed of high-speed trains considering wheel-rail contact
    Choi, Yeon-Sun
    Shin, Bum-Sik
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2015, 29 (11) : 4593 - 4600
  • [28] Critical speed of high-speed trains considering wheel-rail contact
    Yeon-Sun Choi
    Bum-Sik Shin
    Journal of Mechanical Science and Technology, 2015, 29 : 4593 - 4600
  • [29] Air, high-speed rail, or highway: A cost comparison in the California corridor
    Levinson, D
    Kanafani, A
    Gillen, D
    TRANSPORTATION QUARTERLY, 1999, 53 (01): : 123 - 131
  • [30] Air, high-speed rail, or highway: A cost comparison in the California corridor
    UC, Berkeley, CA, United States
    Transp Q, 1 (123-131):