共 50 条
- [31] EVALUATION OF LABORATORY AND PILOT-SCALE SYSTEMS FOR OPTIMIZING OPERATION OF FULL-SCALE TREATMENT FACILITIES - A PROJECT OF THE TAPPI-WASTE-COMMITTEE TAPPI JOURNAL, 1987, 70 (10): : 173 - 176
- [32] ANALYSIS OF FULL-SCALE SBR OPERATION AT GRUNDY-CENTER, IOWA JOURNAL WATER POLLUTION CONTROL FEDERATION, 1987, 59 (03): : 132 - 138
- [37] Pilot To Full-Scale Production: A Battery Module Assembly Case Study 51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 796 - 801