Optimal Balancing of Multi-Objective U-Shaped Assembly Lines using the TSGA Method

被引:4
|
作者
Suwannarongsri, S. [1 ]
Puangdownreong, D. [2 ]
机构
[1] South East Asia Univ, Fac Engn, Dept Ind Engn, Bangkok, Thailand
[2] South East Asia Univ, Fac Engn, Dept Elect Engn, Bangkok, Thailand
关键词
U-shaped assembly line balancing; tabu search; genetic algorithm; multiple objective;
D O I
10.1109/IEEM.2008.4737880
中图分类号
F [经济];
学科分类号
02 ;
摘要
Many assembly lines in industries are now being designed as the U-shaped assembly line balancing (UALB) due to pressures of just-in-time manufacturing. Once compared to the straight assembly line balancing (SALB), it has better balancing, improved communication, fewer workstations, and more flexibility for adjustment. This paper proposes a hybrid intelligent approach to solve such the UALB problems. The TSGA method consisting of the tabu search (TS) and the genetic algorithm (GA) is used to identify solutions for the UALB problems. The multiple objectives including the workload variance, the idle time, and the line efficiency, are proposed and set as the objective function of search process. With the proposed approach, the TS can well address the number of tasks assigned for each workstation of the U-shaped line, while the GA can also assign the sequence of tasks for each workstation according to precedence constraints. The proposed approach is tested against three UALB problems from a survey of literature. Obtained results are compared with results obtained from the single-objective approach. As results, the proposed multiple-objective approach based on the TSGA method gives better solutions for all UALB problems.
引用
收藏
页码:307 / +
页数:2
相关论文
共 50 条
  • [31] Multi-objective Discrete Brainstorming Optimizer for Multiple-product Partial U-shaped Disassembly Line Balancing Problem
    Wu, Kun
    Guo, Xiwang
    Liu, Shixin
    Qi, Liang
    Zhao, Jian
    Zhao, Ziyan
    Wang, Xu
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 305 - 310
  • [32] Meeting demand variation using flexible U-shaped assembly lines
    Simaria, A. S.
    de Sa, M. Zanella
    Vilarinho, P. M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (14) : 3937 - 3955
  • [33] A new heuristic-based bi-objective simulated annealing method for U-shaped assembly line balancing
    Fathi, Masood
    Jesus Alvarez, Maria
    Rodriuez, Victoria
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (02) : 145 - 169
  • [34] Robotic U-shaped assembly line balancing using particle swarm optimization
    Nilakantan, J. Mukund
    Ponnambalam, S. G.
    ENGINEERING OPTIMIZATION, 2016, 48 (02) : 231 - 252
  • [35] Balancing U-shaped assembly lines with resource dependent task times: A Simulated Annealing approach
    Jayaswal, Sachin
    Agarwal, Prashant
    JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (04) : 522 - 534
  • [36] Balancing of mixed-model parallel U-shaped assembly lines considering model sequences
    Kucukkoc, Ibrahim
    Zhang, David Z.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) : 5958 - 5975
  • [37] Balancing of parallel U-shaped assembly lines with a heuristic algorithm based on bidirectional priority values
    Jiao, Yuling
    Deng, Xue
    Li, Mingjuan
    Xing, Xiaocui
    Xu, Binjie
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2022, 30 (01): : 80 - 92
  • [38] Improving labor productivity with U-shaped assembly lines
    Aase, GR
    DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1257 - 1259
  • [39] Mixed-model U-shaped assembly lines: Balancing and comparing with straight lines with buffers and parallel workstations
    Tiacci, Lorenzo
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 45 : 286 - 305
  • [40] U-shaped assembly line balancing problem with genetic algorithm
    Hwang, Rea Kook
    Katayama, Hiroshi
    Gen, Mitsuo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (16) : 4637 - 4649