Optimal Balancing of Multi-Objective U-Shaped Assembly Lines using the TSGA Method

被引:4
|
作者
Suwannarongsri, S. [1 ]
Puangdownreong, D. [2 ]
机构
[1] South East Asia Univ, Fac Engn, Dept Ind Engn, Bangkok, Thailand
[2] South East Asia Univ, Fac Engn, Dept Elect Engn, Bangkok, Thailand
关键词
U-shaped assembly line balancing; tabu search; genetic algorithm; multiple objective;
D O I
10.1109/IEEM.2008.4737880
中图分类号
F [经济];
学科分类号
02 ;
摘要
Many assembly lines in industries are now being designed as the U-shaped assembly line balancing (UALB) due to pressures of just-in-time manufacturing. Once compared to the straight assembly line balancing (SALB), it has better balancing, improved communication, fewer workstations, and more flexibility for adjustment. This paper proposes a hybrid intelligent approach to solve such the UALB problems. The TSGA method consisting of the tabu search (TS) and the genetic algorithm (GA) is used to identify solutions for the UALB problems. The multiple objectives including the workload variance, the idle time, and the line efficiency, are proposed and set as the objective function of search process. With the proposed approach, the TS can well address the number of tasks assigned for each workstation of the U-shaped line, while the GA can also assign the sequence of tasks for each workstation according to precedence constraints. The proposed approach is tested against three UALB problems from a survey of literature. Obtained results are compared with results obtained from the single-objective approach. As results, the proposed multiple-objective approach based on the TSGA method gives better solutions for all UALB problems.
引用
收藏
页码:307 / +
页数:2
相关论文
共 50 条
  • [21] Balancing straight and U-shaped assembly lines with resource dependent task times
    Kara, Yakup
    Ozguven, Cemal
    Yalcin, Nese
    Atasagun, Yakup
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (21) : 6387 - 6405
  • [22] Random double U-shaped assembly line balancing method using priority value
    Jiao Y.-L.
    Li M.-J.
    Wang Z.-Z.
    Jin H.-Q.
    Yang Z.-W.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2020, 50 (06): : 2087 - 2093
  • [23] Multi-objective Optimizer with Collaborative Resource Allocation Strategy for U-shaped Stochastic Disassembly Line Balancing Problem
    Xu, Song
    Guo, XiWang
    Liu, ShiXin
    Qi, Liang
    Qin, Shujin
    Zhao, ZiYan
    Tang, Ying
    2021 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2021, : 2316 - 2321
  • [24] Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem
    Li, Zixiang
    Kucukkoc, Ibrahim
    Tang, Qiuhua
    Zhang, Zikai
    OPTIMIZATION AND ENGINEERING, 2023, 24 (01) : 591 - 622
  • [25] Models and two-phase bee algorithms for multi-objective U-shaped disassembly line balancing problem
    Zixiang Li
    Ibrahim Kucukkoc
    Qiuhua Tang
    Zikai Zhang
    Optimization and Engineering, 2023, 24 : 591 - 622
  • [26] U-Shaped Assembly Line Balancing by Using Differential Evolution Algorithm
    Sresracoo, Poontana
    Kriengkorakot, Nuchsara
    Kriengkorakot, Preecha
    Chantarasamai, Krit
    MATHEMATICAL AND COMPUTATIONAL APPLICATIONS, 2018, 23 (04)
  • [27] Simulation-based Assembly Line Balancing in U-shaped, Parallel U-shaped, and Parallel Adjacent U-shaped Layouts
    Doung, P.
    Sirovetnukul, R.
    Ren, J.
    2020 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2020, : 751 - 755
  • [28] Balancing optimization of U-shaped assembly lines based on stochastic chance constrained programming
    Tang Q.
    Lin B.
    He X.
    Zhang L.
    Zhang C.
    Cao X.
    1600, CIMS (22): : 955 - 964
  • [29] U-SHAPED ASSEMBLY LINE BALANCING WITH TEMPORARY WORKERS
    Nakade, Koichi
    Ito, Akiyasu
    Ali, Syed Mithun
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2015, 22 (01): : 134 - 146
  • [30] Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations
    Kellegoz, Talip
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016