Procurement scheduling for complex projects with fuzzy activity durations and lead times

被引:19
|
作者
Dixit, Vijaya [1 ,2 ]
Srivastava, Rajiv K. [2 ]
Chaudhuri, Atanu [2 ]
机构
[1] Inst Management Technol, Nagpur 441502, Maharashtra, India
[2] Indian Inst Management, Lucknow 226013, Uttar Pradesh, India
关键词
Procurement schedule; Complex products; Uncertainty; Fuzzy integer programming; MEAN-VALUE; DECISION; SYSTEM; MANAGEMENT; MODEL;
D O I
10.1016/j.cie.2013.12.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Material procurement is a vital activity for manufacturing complex products like ships and aircrafts with long manufacturing cycle times. The project activities are interlinked through numerous precedence and succession rules. Given these interdependencies, it is difficult to ascertain the durations of the activities precisely at planning stage and creates uncertainty in the requirement dates of the items. The lead times of items are also not known accurately and result in uncertainty in the availability dates. Consequently, inventory holding and shortage costs incurred cannot be crisply defined. The objective of this paper is to develop a procurement scheduling model considering the above uncertainties. We have developed a method to calculate fuzzy holding and shortage costs and used those as fuzzy cost coefficients in the procurement scheduling model. It minimizes the sum of the above costs under budget constraints and generates optimal ordering schedule. It is applied for procurement scheduling of a real ship building project. Two types of sensitivity analyses were performed: first to understand the effect of variation of degree of uncertainty on total cost and on stage budget requirements and second to study the effect of changes in allocated stage budget parameters on total cost. The results indicate that total cost can be reduced significantly if stage wise budgets are determined considering the uncertainties rather than allocating budget upfront and treating them as constraints. The sensitivity analyses performed, helps in identifying the most sensitive stage of the project and determine the ranges in which stage-wise budgets can be varied. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:401 / 414
页数:14
相关论文
共 50 条
  • [31] Method of Project Scheduling under Fuzzy Estimation of Durations and Precedence Relationships of Activities
    Tseng, H. S.
    Chiou, H. W.
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1914 - 1922
  • [32] Reactive project scheduling: minimizing delays in the completion times of projects
    Adamu P.I.
    Akinwumi I.I.
    Okagbue H.I.
    Asian Journal of Civil Engineering, 2019, 20 (8) : 1189 - 1202
  • [33] Operating Room Surgery Scheduling with Fuzzy Surgery Durations Using a Metaheuristic Approach
    Nazif, Habibeh
    ADVANCES IN OPERATIONS RESEARCH, 2018, 2018
  • [34] Scheduling policies, batch sizes, and manufacturing lead times
    Benjaafar, S
    Sheikhzadeh, M
    IIE TRANSACTIONS, 1997, 29 (02) : 159 - 166
  • [35] Parallel Hybrid Metaheuristics for the Scheduling with Fuzzy Processing Times
    Bozejko, Wojciech
    Czapinski, Michal
    Wodecki, Mieczyslaw
    ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, PT II, 2010, 6114 : 379 - +
  • [36] Parallel machine scheduling models with fuzzy processing times
    Peng, J
    Liu, BD
    INFORMATION SCIENCES, 2004, 166 (1-4) : 49 - 66
  • [37] Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations
    Hu, Changming
    Liu, Dajiang
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (09)
  • [38] Public procurement capabilities as engines for collaboration and enhanced performance in complex projects
    Santos, Juliana Bonomi
    Cabral, Sandro
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2022, 42 (01) : 32 - 58
  • [39] Robust Resource-Constrained Project Scheduling with Uncertain Activity Durations
    Csebfalvi, G.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [40] (Q, s) models for inventory policy with random component procurement lead times
    Mhada, Fatima
    Malhame, Roland
    Pellerin, Robert
    Sadr, Javad
    Gharbi, Ali
    PROCEEDINGS OF 2013 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IEEE-IESM 2013), 2013, : 718 - 726