Procurement scheduling for complex projects with fuzzy activity durations and lead times

被引:19
|
作者
Dixit, Vijaya [1 ,2 ]
Srivastava, Rajiv K. [2 ]
Chaudhuri, Atanu [2 ]
机构
[1] Inst Management Technol, Nagpur 441502, Maharashtra, India
[2] Indian Inst Management, Lucknow 226013, Uttar Pradesh, India
关键词
Procurement schedule; Complex products; Uncertainty; Fuzzy integer programming; MEAN-VALUE; DECISION; SYSTEM; MANAGEMENT; MODEL;
D O I
10.1016/j.cie.2013.12.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Material procurement is a vital activity for manufacturing complex products like ships and aircrafts with long manufacturing cycle times. The project activities are interlinked through numerous precedence and succession rules. Given these interdependencies, it is difficult to ascertain the durations of the activities precisely at planning stage and creates uncertainty in the requirement dates of the items. The lead times of items are also not known accurately and result in uncertainty in the availability dates. Consequently, inventory holding and shortage costs incurred cannot be crisply defined. The objective of this paper is to develop a procurement scheduling model considering the above uncertainties. We have developed a method to calculate fuzzy holding and shortage costs and used those as fuzzy cost coefficients in the procurement scheduling model. It minimizes the sum of the above costs under budget constraints and generates optimal ordering schedule. It is applied for procurement scheduling of a real ship building project. Two types of sensitivity analyses were performed: first to understand the effect of variation of degree of uncertainty on total cost and on stage budget requirements and second to study the effect of changes in allocated stage budget parameters on total cost. The results indicate that total cost can be reduced significantly if stage wise budgets are determined considering the uncertainties rather than allocating budget upfront and treating them as constraints. The sensitivity analyses performed, helps in identifying the most sensitive stage of the project and determine the ranges in which stage-wise budgets can be varied. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:401 / 414
页数:14
相关论文
共 50 条
  • [21] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís PONZ-TIENDA
    Eugenio PELLICER
    Víctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, (01) : 56 - 68
  • [22] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Luis Ponz-Tienda, Jose
    Pellicer, Eugenio
    Yepes, Victor
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2012, 13 (01): : 56 - 68
  • [23] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    Jos Lus PONZTIENDA
    Eugenio PELLICER
    Vctor YEPES
    Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2012, 13 (01) : 56 - 68
  • [24] Complete fuzzy scheduling and fuzzy earned value management in construction projects
    José Luís Ponz-Tienda
    Eugenio Pellicer
    Víctor Yepes
    Journal of Zhejiang University SCIENCE A, 2012, 13 : 56 - 68
  • [25] Expected Shortfall for the Makespan in Activity Networks With Fuzzy Durations
    Dellino, Gabriella
    Meloni, Carlo
    Pranzo, Marco
    Sama, Marcella
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2022, 30 (06) : 2124 - 2128
  • [26] A decision support system for fuzzy scheduling of software projects
    Sanal, UZ
    AUTOTESTCON 2000: IEEE SYSTEMS READINESS TECHNOLOGY CONFERENCE, PROCEEDINGS, 2000, : 263 - 272
  • [27] Fuzzy Repetitive Scheduling Method for Projects with Repeating Activities
    Maravas, Alexander
    Pantouvakis, John-Paris
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (07): : 561 - 564
  • [28] A fuzzy robust scheduling approach for product development projects
    Wang, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) : 180 - 194
  • [29] Survey and analysis on the dependence of activity durations in project scheduling networks
    Mo Junwen
    Gao Mingxia
    Yin Yilin
    PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 86 - 90
  • [30] Project Scheduling for Maximum NPV with Variable Activity Durations and Uncertain Activity Outcomes
    Creemers, S.
    Leus, R.
    De Reyck, B.
    Lambrecht, M.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 183 - +