Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal

被引:46
|
作者
Gilbert, Alexander [1 ]
Sovacool, Benjamin K. [2 ,3 ]
Johnstone, Phil [2 ]
Stirling, Andy [2 ]
机构
[1] Spark Lib, Washington, DC 89431 USA
[2] Univ Sussex, Sch Business Management & Econ, Sci Policy Res Unit SPRU, Brighton, E Sussex, England
[3] Aarhus Univ, Ctr Energy Technol, Dept Business Dev & Technol, Birk Centerpark 15, Aarhus, Denmark
关键词
Construction cost overrun; Nuclear power; Nuclear energy; Atomic energy; ENERGY;
D O I
10.1016/j.enpol.2016.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
Lovering and colleagues attempt to advance understanding of construction cost escalation risks inherent in building nuclear reactors and power plants, a laudable goal. Although we appreciate their focus on capital cost increases and overruns, we maintain in this critical appraisal that their study conceptualizes cost issues in a limiting way. Methodological choices in treating different cost categories by the authors mean that their conclusions are more narrowly applicable than they describe. We also argue that their study is factually incorrect in its criticism of the previous peer-reviewed literature. Earlier work, for instance, has compared historical construction costs for nuclear reactors with other energy sources, in many countries, and extending over several decades. Lastly, in failing to be transparent about the limitations of their own work, Lovering et al. have recourse to a selective choice of data, unbalanced analysis, and biased interpretation. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:644 / 649
页数:6
相关论文
共 50 条
  • [1] Time and cost overruns in the UAE construction industry: a critical analysis
    Johnson, Reshma Mary
    Babu, Robin Itty Ipe
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 402 - 411
  • [2] UNDERGROUND CONSTRUCTION OF NUCLEAR-POWER REACTORS
    PINTO, S
    NUCLEAR ENGINEERING AND DESIGN, 1980, 61 (03) : 441 - 458
  • [3] Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses
    Sovacool, Benjamin K.
    Gilbert, Alex
    Nugent, Daniel
    ENERGY, 2014, 74 : 906 - 917
  • [4] Investigation of critical factors affecting cost overruns and delays in Egyptian mega construction projects
    Daoud, Ahmed Osama
    El Hefnawy, Mohammed
    Wefki, Hossam
    ALEXANDRIA ENGINEERING JOURNAL, 2023, 83 : 326 - 334
  • [5] Historical construction costs of global nuclear power reactors
    Lovering, Jessica R.
    Yip, Arthur
    Nordhaus, Ted
    ENERGY POLICY, 2016, 91 : 371 - 382
  • [6] Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation Driven Approach
    Elbashbishy, Tamima S.
    Hosny, Ossama A.
    Waly, Ahmed F.
    Dorra, Elkhayam M.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (06)
  • [7] A reply to "Historical construction costs of global nuclear power reactors"
    Koomey, Jonathan
    Hultman, Nathan E.
    Grubler, Arnulf
    ENERGY POLICY, 2017, 102 : 640 - 643
  • [8] Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation
    Chadee, Aaron Anil
    Martin, Hector Hugh
    Gallage, Sihara
    Banerjee, Kailas Sekhar
    Roopan, Ryan
    Rathnayake, Upaka
    Ray, Indrajit
    BUILDINGS, 2023, 13 (05)
  • [9] Emerging small modular nuclear power reactors: A critical review
    Hussein, Esam M. A.
    PHYSICS OPEN, 2020, 5
  • [10] NUCLEAR POWER STATIONS WITH BOILING WATER REACTORS - CONSTRUCTION AND SAFETY ASPECTS
    KORNBICH.H
    ATOM & STROM, 1968, 14 (2-3): : 21 - &