共 50 条
- [24] Main parameters of a wastewater treatment plant up to 2000 PE in the Czech Republic ADVANCES IN ENVIRONMENTAL ENGINEERING (AEE2019), 2020, 444
- [30] FEASIBILITY OF WASTEWATER TREATMENT PLANT UPGRADE BY ENHANCED BIOLOGICAL PHOSPHORUS REMOVAL: CASE STUDY KOPRIVNICA, CROATIA FRESENIUS ENVIRONMENTAL BULLETIN, 2016, 25 (06): : 1811 - 1819