Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects

被引:33
|
作者
Menesi, Wail [1 ]
Hegazy, Tarek [2 ]
机构
[1] Revay & Associates Ltd, Toronto, ON M2J 4Y1, Canada
[2] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
关键词
Construction management; Scheduling; Constraint programming; Multimode resource-constrained scheduling; Constrained resource scheduling; Schedule optimization; ANT COLONY OPTIMIZATION; PROGRAMMING APPROACH;
D O I
10.1061/(ASCE)ME.1943-5479.0000338
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper aims at providing a fast near-optimum solution to the multimode resource-constrained project scheduling problem (MRCPSP) in large-scale projects, with and without resource-leveling constraints. The MRCPSP problem is known to be nondeterministic polynomial-time hard (NP-hard) and has been solved using various exact, heuristic, and metaheuristic procedures. In this paper, constraint programming (CP) is used as an advanced mathematical optimization technique that suits scheduling problems. The IBM ILOG modeling software and its CPLEX-CP solver engine have been used to develop a CP optimization model for the MRCPSP problem. Unlike many metaheuristic methods in literature, the CP model is fast and provides a near-optimum solution to the MRCPSP for projects with hundreds of activities within minutes. The paper compares the CP results with two case studies from the literature to prove the practicality and usefulness of the CP approach to both researchers and practitioners. One case study was used as the basis for creating larger projects with up to 2,000 activities. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. This research contributes to developing a practical decision support system for resolving real-life constraints in projects. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [2] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    Journal of Global Optimization, 2020, 76 : 211 - 241
  • [3] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [4] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [5] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [6] Resource-constrained scheduling in repetitive projects
    Zhang, Li-hui
    Zou, Xin
    Chen, Xin-lu
    Advances in Information Sciences and Service Sciences, 2012, 4 (14): : 287 - 294
  • [7] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [8] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [9] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [10] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205