Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects

被引:33
|
作者
Menesi, Wail [1 ]
Hegazy, Tarek [2 ]
机构
[1] Revay & Associates Ltd, Toronto, ON M2J 4Y1, Canada
[2] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON N2L 3G1, Canada
关键词
Construction management; Scheduling; Constraint programming; Multimode resource-constrained scheduling; Constrained resource scheduling; Schedule optimization; ANT COLONY OPTIMIZATION; PROGRAMMING APPROACH;
D O I
10.1061/(ASCE)ME.1943-5479.0000338
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper aims at providing a fast near-optimum solution to the multimode resource-constrained project scheduling problem (MRCPSP) in large-scale projects, with and without resource-leveling constraints. The MRCPSP problem is known to be nondeterministic polynomial-time hard (NP-hard) and has been solved using various exact, heuristic, and metaheuristic procedures. In this paper, constraint programming (CP) is used as an advanced mathematical optimization technique that suits scheduling problems. The IBM ILOG modeling software and its CPLEX-CP solver engine have been used to develop a CP optimization model for the MRCPSP problem. Unlike many metaheuristic methods in literature, the CP model is fast and provides a near-optimum solution to the MRCPSP for projects with hundreds of activities within minutes. The paper compares the CP results with two case studies from the literature to prove the practicality and usefulness of the CP approach to both researchers and practitioners. One case study was used as the basis for creating larger projects with up to 2,000 activities. The results reported in this paper can be used as a benchmark for other researchers to compare and improve. This research contributes to developing a practical decision support system for resolving real-life constraints in projects. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Improved genetic algorithm for resource-constrained scheduling of large projects
    Kim, Jin-Lee
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) : 1016 - 1027
  • [22] A metaheuristic scheduling procedure for resource-constrained projects with cash flows
    Zhu, D
    Padman, R
    NAVAL RESEARCH LOGISTICS, 1999, 46 (08) : 912 - 927
  • [23] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [24] An integer programming approach to the multimode resource-constrained multiproject scheduling problem
    Túlio A. M. Toffolo
    Haroldo G. Santos
    Marco A. M. Carvalho
    Janniele A. Soares
    Journal of Scheduling, 2016, 19 : 295 - 307
  • [25] An integer programming approach to the multimode resource-constrained multiproject scheduling problem
    Toffolo, Tulio A. M.
    Santos, Haroldo G.
    Carvalho, Marco A. M.
    Soares, Janniele A.
    JOURNAL OF SCHEDULING, 2016, 19 (03) : 295 - 307
  • [26] Resource-Constrained Multiple Projects Scheduling with the Objective of Minimizing Activities Cost
    Liu, Zhenyuan
    Zheng, Yanqi
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1027 - 1032
  • [27] Scheduling Resource-Constrained Projects with Ant Colony Optimization Artificial Agents
    Christodoulou, Symeon M.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (01) : 45 - 55
  • [28] An organizational cooperative coevolutionary algorithm for multimode resource-constrained project scheduling problems
    Wang, Lixia
    Liu, Jing
    Zhou, Mingxing
    Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 2014, 8886 : 680 - 690
  • [29] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572
  • [30] HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING
    ELSAYED, EA
    NASR, NZ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) : 299 - 310