SUPPLY SYSTEM IN PAP POWER SAS

被引:0
|
作者
Munoz Alvarado, Fanny Patricia [1 ]
Angel Fuentes, Ever [1 ]
机构
[1] Libre Univ, Bogota, Cundinamarca, Colombia
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In general terms, any production system to ensure its operation needs to get since outside a range of inputs and materials from which they made the transformation processes. From this, in Pap power SAS supplying or procurement as logistic function focuses its main objective to plan and provide the material required to develop products to focus on cost reduction and customer satisfaction. Among its main activities are: 1. The calculation of needs, where logistics planning is involve for the determination of material amounts required for a given time. 2. The purchase or acquisition of materials function that has as main objectives: To maintain continuity of supply, pay fair prices, prevent damage, waste and duplication, seek sources of supply, alternatives, and identifying new products and materials. 3. Obtaining, aimed at contributing to the continuity of activities, avoiding delays and making the respective quality checks. 4. Storage, with specific objectives such as control of the accuracy of their stocks, conservation of materials; and timely replenishment. 5. Office or distribution function to ensure that customer requirements are addressed in a timely and appropriate manner. 6. Stocks control, where it must keep in mind the exact quantities to supply to meet the requirements of material without exceeding the storage capacity [9]. In order to comply with these activities is necessary to design management strategies and control for each, thereby taking Pap Power SAS a policy of purchasing, warehousing, inventory and plans to help to determinate the quantities of material to apply to according to the needs and requirements of the company bearing in mind the key success factor of an adequate supply, costs reduction.
引用
收藏
页码:441 / 450
页数:10
相关论文
共 50 条
  • [41] The power factor analysis of the power supply system under two power supply modes in urban rail transit
    College of Electrical Engineering, Zhejiang University, Hangzhou Zhejiang 310027, China
    不详
    不详
    不详
    Zhongguo Tiedao Kexue, 2009, 6 (67-71):
  • [42] Distributed Power Supply Trading Technology in New Power System
    Liu, Moupeng
    Chang, Xin
    Zhang, Nan
    Li, Guodong
    Tan, Hao
    2023 2ND ASIAN CONFERENCE ON FRONTIERS OF POWER AND ENERGY, ACFPE, 2023, : 333 - 338
  • [43] A Hybrid Railway Power Conditioner for Traction Power Supply system
    Dai, NingYi
    Lao, KengWeng
    Wong, ManChung
    2013 TWENTY-EIGHTH ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION (APEC 2013), 2013, : 1326 - 1331
  • [44] A high-power LINAC RF power supply system
    Alimov, AS
    Chubarov, OV
    Shvedunov, VI
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1997, 44 (03) : 1033 - 1036
  • [45] High-power LINAC RF power supply system
    Alimov, AS
    Chubarov, OV
    Shvedunov, VI
    1996 IEEE NUCLEAR SCIENCE SYMPOSIUM - CONFERENCE RECORD, VOLS 1-3, 1997, : 681 - 683
  • [46] Offers of electric power saving in power supply system of works
    Mozhaev, N.S.
    Bambizov, A.G.
    Tsarikov, V.S.
    Promyshlennaya Energetika, 2001, (04): : 8 - 12
  • [47] Discussion on the Management of Special Power Supply System for Power Communication
    Qi, Xiaoyong
    Li, Yongjie
    Hou, Huanpeng
    Yang, Xiaopeng
    PROCEEDINGS OF THE 4TH INTERNATIONAL SYMPOSIUM ON NEW ENERGY AND ELECTRICAL TECHNOLOGY, ISNEET 2023, 2024, 1255 : 499 - 505
  • [48] An Improved Capacitor Charging Power Supply for a Power Conditioning System
    Tan, Qinyue
    Lin, Fuchang
    Wang, Shaorong
    Zhong, Heqing
    Liu, Gang
    Deng, Yu
    IEEE TRANSACTIONS ON DIELECTRICS AND ELECTRICAL INSULATION, 2011, 18 (04) : 1214 - 1220
  • [49] The electromechanical power system link for backup power supply of consumers
    Vorontsov, Aleksey
    Glushakov, Vasiliy
    Pronin, Mikhail
    Shelyukh, Vasiliy
    Kukushkin, Denis
    Tretyakov, Victor
    IECON 2020: THE 46TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2020, : 1715 - 1720
  • [50] Power quality disturbances in power supply system of the subway of Rome
    Lamedica, R
    Maranzano, G
    Marzinotto, M
    Prudenzi, A
    2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 924 - 929