Wuhan - Guangzhou Passenger Dedicated Line (WGPDL)-1000 km Highspeed-Railway-Line in Central China

被引:0
|
作者
Kreutzer, M. [1 ]
Kirschke, D. [2 ]
Vogt, L. [3 ]
机构
[1] OBERMEYER Planen Beraten GmbH, D-80686 Munich, Germany
[2] Beratender Ingenieur Felsmech & Tunnelbau, D-76275 Ettlingen, Germany
[3] Baugrund Dresden Ingenieurgesell mbH, D-01097 Dresden, Germany
来源
BAUINGENIEUR | 2009年 / 84卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The German engineering and architectural consultancy OBERMEYER is currently entrusted with extensive advisory services for the design and construction of the almost 1000 km long highspeed railway line from Wuhan to Guangzhou in central China. The present article addresses the sectors earthworks, tunnel construction and slab track by way of example.
引用
收藏
页码:185 / 194
页数:10
相关论文
共 46 条
  • [1] Analysis of initial traffic volume of Wuhan-Guangzhou passenger dedicated line
    Ren, Jun-Hua
    Ren, Min
    Ren, M., 1600, Editorial Department of Journal of Railway Engineering Society, China (30): : 115 - 119
  • [2] Technical research on the earthwork quality control for the 1000 km long high speed railway line Wuhan-Guangzhou.
    Tang, Xiaoguang
    Hu, Yifeng
    BAUTECHNIK, 2009, 86 (02) : 101 - 110
  • [3] Research on model test of soft rock roadbed in special passenger railway line of Wuhan-Guangzhou
    Chen Ai-yun
    Guo Jian-hu
    ROCK AND SOIL MECHANICS, 2008, 29 (10) : 2882 - 2886
  • [4] Dynamic behaviour of the contact line for 350 km/h on the new line Wuhan - Guangzhou
    Zimmert, Gerhard
    eb - Elektrische Bahnen, 2010, 108 (04): : 147 - 155
  • [5] Modeling subgrade settlement in the Wuhan-Guangzhou passenger rail line
    Civil Engineering Institute, Central South University, Changsha, Hunan, China
    不详
    Electron. J. Geotech. Eng., 11 (4479-4495):
  • [6] Study on Construction and Operation of the Passenger Dedicated Railway Line in the Process of China's Urbanization
    Niu Yongtao
    Han Baoming
    URBANIZATION AND LAND RESERVATION RESEARCH, 2009, : 1 - +
  • [7] Research on the Price Optimization of Passenger Dedicated Line in China
    Li, Ying
    Zhang, Jing
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2013), 2013, : 483 - 490
  • [8] New method for forecasting subgrade settlement of railway passenger dedicated line
    Chen, Shan-Xiong
    Wang, Xing-Yun
    Xu, Xi-Chang
    Wang, Xiao-Gang
    Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (02): : 478 - 482
  • [9] Research on the Cyclic Train Service Plan of Passenger Dedicated Railway Line
    Xu Bin
    Han Booming
    Li Dewei
    Zhang Qi
    2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 4, 2011, 4 : 78 - 83
  • [10] New method for forecasting subgrade settlement of railway passenger dedicated line
    Chen Shan-xiong
    Wang Xing-yun
    Xu Xi-chang
    Wang Xiao-gang
    ROCK AND SOIL MECHANICS, 2010, 31 (02) : 478 - +