Two models for a family of flowshop sequencing problems

被引:47
|
作者
Stafford, EF [1 ]
Tseng, FT [1 ]
机构
[1] Univ Alabama, Dept Econ Finance & Management Sci, Huntsville, AL 35899 USA
关键词
scheduling; flowshop; sequence-dependent; no intermediate queues;
D O I
10.1016/S0377-2217(01)00320-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents two mixed-integer linear programming (MILP) models (referred to as WST and SGST in the paper) for a family of four different M-machine, N-job flowshop sequencing problems. Each model may be used to solve the regular, no intermediate queues (NIQ), sequence-dependent setup times (SDST), and SDST/NIQ flowshop problems. The optimal job sequence, based on minimizing makespan, is achieved by a positional assignment approach in the WST model, and by pairs of disjunctive (either or) constraints in the SGST model. A 12-cell experimental design was used to compare the solution times of the two models for each of the four flowshop problems. The WST model used significantly less computer time than the SGST model for all problem sizes in the regular, NIQ, and SDST flowshop problems. Both models were competitive in the SDST/NIQ flowshop for N less than or equal to 7. but the WST model proved significantly better for N greater than or equal to 8. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:282 / 293
页数:12
相关论文
共 50 条
  • [41] LOWER BOUNDS IN PERMUTATION FLOWSHOP PROBLEMS
    BANSAL, SP
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1979, 17 (04) : 411 - 418
  • [42] MOEA/D for Flowshop Scheduling Problems
    Chang, Pei Chann
    Chen, Shih Hsin
    Zhang, Qingfu
    Lin, Jun Lin
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 1433 - +
  • [43] FLOWSHOP SEQUENCING PROBLEM WITH ORDERED PROCESSING TIME MATRICES
    SMITH, ML
    PANWALKAR, SS
    DUDEK, RA
    MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (05): : 544 - 549
  • [44] Genetic Algorithms, Path Relinking, and the Flowshop Sequencing Problem
    Reeves, Colin R.
    Yamada, Takeshi
    EVOLUTIONARY COMPUTATION, 1998, 6 (01) : 45 - 60
  • [45] Considering scheduling and preventive maintenance in the flowshop sequencing problem
    Ruiz, Ruben
    Garcia-Diaz, J. Carlos
    Maroto, Concepcion
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (11) : 3314 - 3330
  • [46] Comparative evaluation of MILP flowshop models
    Stafford, EF
    Tseng, FT
    Gupta, JND
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (01) : 88 - 101
  • [47] Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration
    Tang, Lixin
    Liu, Peng
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (02) : 1187 - 1199
  • [48] A hybrid genetic algorithm/fuzzy dynamic programming approach to two-machine flowshop problems
    Zhang, Hong
    Li, Jun
    Zhang, Desheng
    PROCEEDINGS OF THE 10TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA 2012), 2012, : 2399 - 2402
  • [49] The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime
    Allahverdi, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (02) : 373 - 396
  • [50] Two models of two-dimensional bandwidth problems
    Lin, Lan
    Lin, Yixun
    INFORMATION PROCESSING LETTERS, 2010, 110 (11) : 469 - 473