Two models for a family of flowshop sequencing problems

被引:47
|
作者
Stafford, EF [1 ]
Tseng, FT [1 ]
机构
[1] Univ Alabama, Dept Econ Finance & Management Sci, Huntsville, AL 35899 USA
关键词
scheduling; flowshop; sequence-dependent; no intermediate queues;
D O I
10.1016/S0377-2217(01)00320-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents two mixed-integer linear programming (MILP) models (referred to as WST and SGST in the paper) for a family of four different M-machine, N-job flowshop sequencing problems. Each model may be used to solve the regular, no intermediate queues (NIQ), sequence-dependent setup times (SDST), and SDST/NIQ flowshop problems. The optimal job sequence, based on minimizing makespan, is achieved by a positional assignment approach in the WST model, and by pairs of disjunctive (either or) constraints in the SGST model. A 12-cell experimental design was used to compare the solution times of the two models for each of the four flowshop problems. The WST model used significantly less computer time than the SGST model for all problem sizes in the regular, NIQ, and SDST flowshop problems. Both models were competitive in the SDST/NIQ flowshop for N less than or equal to 7. but the WST model proved significantly better for N greater than or equal to 8. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:282 / 293
页数:12
相关论文
共 50 条
  • [1] FLOWSHOP SEQUENCING PROBLEMS WITH LIMITED BUFFER STORAGE
    LEISTEN, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) : 2085 - 2100
  • [2] Two MILP models for the N x M SDST flowshop sequencing problem
    Tseng, FT
    Stafford, EF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (08) : 1777 - 1809
  • [3] An integrated reactive tabu search for flowshop machine sequencing problems
    Braglia, M
    Bressanelli, M
    Gentili, E
    CAD/CAM ROBOTICS AND FACTORIES OF THE FUTURE, 1996, : 621 - 626
  • [4] Hybrid flexible flowshop problems: Models and solution methods
    Naderi, B.
    Gohari, Sheida
    Yazdani, M.
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (24) : 5767 - 5780
  • [5] Sequencing two-stage flowshop with nonidentical job sizes
    Ling-Huey Su
    James C. Chen
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 259 - 268
  • [6] Sequencing two-stage flowshop with nonidentical job sizes
    Su, Ling-Huey
    Chen, James C.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (1-4): : 259 - 268
  • [7] Performance evaluation of the scatter search method for permutation flowshop sequencing problems
    Saravanan, M.
    Haq, A. Noorul
    Vivekraj, A. R.
    Prasad, T.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (11-12): : 1200 - 1208
  • [8] Performance evaluation of the scatter search method for permutation flowshop sequencing problems
    M. Saravanan
    A. Noorul Haq
    A. R. Vivekraj
    T. Prasad
    The International Journal of Advanced Manufacturing Technology, 2008, 37 : 1200 - 1208
  • [9] Sequencing a hybrid two-stage flowshop with dedicated machines
    Riane, F
    Artiba, A
    Elmaghraby, SE
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (17) : 4353 - 4380
  • [10] Sequencing on hybrid two-stages flowshop to minimize makespan
    Riane, F
    Artiba, A
    Elmaghraby, SE
    FIRST INTERNATIONAL CONFERENCE ON OPERATIONS AND QUANTITATIVE MANAGEMENT, VOL 1 AND 2, 1997, : 572 - 579