共 50 条
- [33] Settlement calculation method for over-length piles foundation based on field test in the beijing-shanghai high-speed railway 1600, E-Journal of Geotechnical Engineering (19 M):
- [35] Long-term monitoring technology of beijing-shanghai high-speed railway elevated station track system J. Railw. Eng. Soc., 5 (35-41):
- [36] Settlement calculation method for over-length piles foundation based on field test in the Beijing-Shanghai high-speed railway Electronic Journal of Geotechnical Engineering, 2014, 19 (0Q): : 4371 - 4372
- [37] Synthetical Benefit Evaluation of High-Speed Rail, Take Beijing-Shanghai High-Speed Rail for Example LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1, 2013, : 395 - 402
- [39] Settlement calculation method for over-length piles foundation based on field test in the Beijing-Shanghai high-speed railway Electronic Journal of Geotechnical Engineering, 2014, 19 (0M): : 2997 - 3010
- [40] TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 305 - 310