Simulation Study Based on OpenTrack on Carrying Capacity in District of Beijing-Shanghai High-speed Railway

被引:5
|
作者
Chen, Zhen [1 ]
Han, Baoming [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Traff & Transportat, Beijing 100044, Peoples R China
来源
关键词
High-speed railway; Carrying capacity; Simulation; OpenTrack;
D O I
10.4028/www.scientific.net/AMM.505-506.567
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The paper simulated the carrying capacity in Nanjing-Shanghai district of Beijing-Shanghai high-speed railway by using OpenTrack software. Firstly, the paper modeled stations' topological structures and sections' topological structures of Beijing-Shanghai high-speed railway and set the parameters for simulation. Secondly, the paper simulated on the condition of current train service frequency no less than the frequency in simulation while the headway was respectively 3 minutes, 4 minutes and 5 minutes. Finally, the paper analyzed the carrying capacity in Nanjing-Shanghai district by analyzing the simulation train diagram outputted by OpenTrack.
引用
收藏
页码:567 / 570
页数:4
相关论文
共 50 条
  • [21] SURROUNDING ROCK MASS QUALITY EVALUATION OF XIKEMA TUNNEL IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY
    Li, Zhiyi
    Xu, Zhaoyi
    Zhang, Feng
    Chen, Xiang
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 741 - 746
  • [22] DYNAMIC RESPONSE OF COMPOSITE FOUNDATION WITH CFG-PILE IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY
    Yuan, Jian-Yi
    Gong, Quan-Mei
    Zhou, Shun-Hua
    ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 986 - 991
  • [23] Construction management and technical innovation of the Beijing-Shanghai High Speed Railway
    Lu, Chunfang
    FRONTIERS OF ENGINEERING MANAGEMENT, 2024, 11 (03) : 584 - 587
  • [24] A New Design of Bridge-Subgrade Transition Sections Applied in Beijing-Shanghai High-Speed Railway
    Yang Changwei
    Tong Xinhao
    Zhang Jianjing
    Zhu Haobo
    COMPLEXITY, 2018,
  • [25] The prospect of high-speed transportation system on Beijing-Shanghai corridor
    Takagi, K
    Sato, K
    TRAFFIC AND TRANSPORTATION STUDIES, VOLS 1 AND 2, PROCEEDINGS, 2002, : 218 - 225
  • [26] Correlation of mechanical indices of soft soils in yangcheng lake area of beijing-shanghai high-speed railway
    Wei, Luo
    Liang, Li
    Lianheng, Zhao
    Hao, Liu
    Electronic Journal of Geotechnical Engineering, 2013, 18 C : 451 - 461
  • [27] DESIGN OF RPC-FILLED STEEL TUBE ARCH BRIDGE FOR BEIJING-SHANGHAI HIGH-SPEED RAILWAY
    Luo, Hua
    Yan, Zhigang
    An, Mingzhe
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 797 - 802
  • [28] Research on the management innovation and practice of construction for Beijing-Shanghai high speed railway
    Lu, Chun-Fang
    Journal of Railway Engineering Society, 2014, 31 (09) : 1 - 7
  • [29] Computer-aided system of opening comprehensive maintenance window for Beijing-Shanghai high-speed railway
    Sun, QX
    Cheng, XQ
    TRAFFIC AND TRANSPORTATION STUDIES, PROCEEDINGS, 2004, : 688 - 697
  • [30] KEY ISSUES ON TRAIN LINE PLANNING FOR BEIJING-SHANGHAI HIGH SPEED RAILWAY
    Nie, L.
    Fei, D. B.
    Zhou, S. D.
    Fu, H. L.
    Tong, L.
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, VOL 2, 2010, : 435 - 440