Fuzzy Assessment Model Research on Safety Condition of Tunnel Construction

被引:0
|
作者
Wang, Ning [1 ]
Chen, Mingzhang [1 ]
Zhao, Yucheng [1 ]
机构
[1] Shijiazhuang Railway Inst, Shijiazhuang 050043, Peoples R China
关键词
tunnel; construction; safety; fuzzy assessment;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The safety assessment model on tunneling construction process is the foundation to tunnel construction risk management. Because of the complexity of risk factors that influenced on tunnel construction, the model system construction must take the systematic and integrated principle into account. Considering the impact on tunneling safety from various kinds of factors, this paper makes use of systematic safety engineering, AHP and fuzzy arithmetic theory to establish the fuzzy assessment exponential system and method for tunnel construction safety. After the application of this system and method to JinPing hydropower station engineering and the safety assessment to the shear tunnel in this engineering, it turns out that the result of the safety assessment coincides to the practical situation. This model offers effective and reliable assurance for conducting scientific construction risk management.
引用
收藏
页码:187 / 192
页数:6
相关论文
共 50 条
  • [31] Developing a Risk Assessment Model for construction safety
    Fung, Ivan W. H.
    Tam, Vivian W. Y.
    Lo, Tommy Y.
    Lu, Lori L. H.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (06) : 593 - 600
  • [32] Risk Assessment of Railway Tunnel Construction Based on Grey Fuzzy Linguistic Theory
    Wang, Peng
    Wei, Qiang
    Wang, Jingchun
    Zhao, Guotang
    Journal of Railway Engineering Society, 2023, 39 (11) : 106 - 112
  • [33] Static and dynamic fuzzy assessment methods for the collapse risk of mountain tunnel construction
    Huang, Zhen
    Gao, Feng
    Li, Xuesong
    Jiang, Min
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (05) : 7975 - 7999
  • [34] Risk assessment of shield tunnel construction cost using fuzzy fault tree
    Zheng, Jun-Jie
    Lin, Chi-Feng
    Zhao, Dong-An
    Ding, Lie-Yun
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (04): : 501 - 508
  • [35] Research of Safety Assessment of Work System in Construction Project
    Xie, XianMing
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ECONOMIC AND BUSINESS MANAGEMENT 2016, 2016, 16 : 345 - 350
  • [36] Development of of a safety performance index assessment tool by using a fuzzy structural equation model for construction sites
    Gunduz, Murat
    Birgonul, M. Talat
    Ozdemir, Mustafa
    AUTOMATION IN CONSTRUCTION, 2018, 85 : 124 - 134
  • [37] A static risk assessment model for underwater shield tunnel construction
    Zhiqiang Wu
    Shuliang Zou
    Sādhanā, 2020, 45
  • [38] A static risk assessment model for underwater shield tunnel construction
    Wu, Zhiqiang
    Zou, Shuliang
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2020, 45 (01):
  • [39] Risk Assessment of Tunnel Construction Based on Improved Cloud Model
    Lin, C. J.
    Zhang, M.
    Li, L. P.
    Zhou, Z. Q.
    Liu, S.
    Liu, C.
    Li, T.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2020, 34 (03)
  • [40] Research on safety management evaluation model based on fuzzy neural network for power plant construction project
    Niu, Dongxiao
    Wang, Yongli
    Xing, Mian
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2007, 14 : 376 - 380