An improved PSO algorithm for resource-constrained project scheduling problem

被引:0
|
作者
Luo, Xinggang [1 ,2 ]
Wang, Dingwei [2 ]
Tang, Jianfu [2 ]
Tu, Yiliu [3 ]
机构
[1] Northeastern Univ, Comp Ctr, Shenyang 110004, Peoples R China
[2] Northeastern Univ, Sch Informat Sci & Engn, Shenyang 110004, Peoples R China
[3] Univ Calgary, Dept Mechan & Mfg Engn, Calgary, AB, Canada
关键词
resource-constrained; project scheduling; particle swarm optimization;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
An improved Particle Swarm Optimization (PSO) algorithm for resource-con strained project scheduling problem is proposed. The particle presentation, encoding scheme and decoding rule of this algorithm are presented. Improvements based on the basic PSO include: the particle swarm is initialized by heuristic rule to improve the quality of particles; inertia weight is self-adapted with iteration of the algorithm to decelerate the speed of particles; crossover mechanism of genetic algorithm are applied to particle swarm to enable the exchange of good characteristics between two particles. Computational results for project instances of PSPLIB demonstrate that this improved PSO is effective compared with other mataheuristic approaches.
引用
收藏
页码:3514 / +
页数:2
相关论文
共 50 条
  • [31] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [32] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [33] An Improved Cuckoo Search Algorithm for Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations
    Jin, Yidong
    Nie, Hui
    Duan, Pengfei
    Yang, Huihua
    PROCEEDINGS OF THE 2016 12TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2016, : 1086 - 1090
  • [34] A Genetic Algorithm with Neighborhood Search for the Resource-Constrained Project Scheduling Problem
    Proon, Sepehr
    Jin, Mingzhou
    NAVAL RESEARCH LOGISTICS, 2011, 58 (02) : 73 - 82
  • [35] Solving Resource-Constrained Project Scheduling Problem Using Metaheuristic Algorithm
    Munlin, Mudarmeen
    2018 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONIC ENGINEERING (ICEEE), 2018, : 344 - 349
  • [36] Genetic Algorithm Parameters Tuning for Resource-constrained Project Scheduling Problem
    Tian, Xingke
    Yuan, Shengrui
    ADVANCES IN MATERIALS, MACHINERY, ELECTRONICS II, 2018, 1955
  • [37] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    Dorndorf, U
    Pesch, E
    Phan-Huy, T
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 413 - 439
  • [38] A branch-and-bound algorithm for the resource-constrained project scheduling problem
    U. Dorndorf
    E. Pesch
    T. Phan-Huy
    Mathematical Methods of Operations Research, 2000, 52 : 413 - 439
  • [39] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [40] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518