共 50 条
- [21] Heuristic algorithm for flexible resource-constrained project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
- [24] An estimation of distribution algorithm for resource-constrained project scheduling problem 2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
- [25] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm 2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
- [26] An improved particle swarm optimization for the resource-constrained project scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2627 - 2638
- [27] An improved particle swarm optimization for the resource-constrained project scheduling problem The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
- [29] Resource-constrained project scheduling problem with reworking Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774