Study of the flood control scheduling scheme for the Three Gorges Reservoir in a catastrophic flood

被引:17
|
作者
Zhang, Shanghong [1 ]
Jing, Zhu [1 ]
Li, Wenda [1 ]
Yi, Yujun [2 ]
Zhao, Yong [3 ]
机构
[1] North China Elect Power Univ, Renewable Energy Sch, Beijing 102206, Peoples R China
[2] Beijing Normal Univ, Sch Environm, Beijing 100875, Peoples R China
[3] China Inst Water Resources & Hydropower Res, Beijing 100038, Peoples R China
基金
中国国家自然科学基金;
关键词
catastrophic flood; dynamic capacity regulation for floods; flood control scheduling; Jingjiang Flood Diversion Area; Three Gorges Reservoir;
D O I
10.1002/hyp.11515
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
The Three Gorges Project is the world's largest water conservancy project. According to the design standards for the 1,000-year flood, flood diversion areas in the Jingjiang reach of the Yangtze River must be utilized to ensure the safety of the Jingjiang area and the city of Wuhan. However, once these areas are used, the economic and life loss in these areas may be very great. Therefore, it is vital to reduce this loss by developing a scheme that reduces the use of the flood diversion areas through flood regulation by the Three Gorges Reservoir (TGR), under the premise of ensuring the safety of the Three Gorges Dam. For a 1,000-year flood on the basis of a highly destructive flood in 1954, this paper evaluates scheduling schemes in which flood diversion areas are or are not used. The schemes are simulated based on 2.5-m resolution reservoir topography and an optimized model of dynamic capacity flood regulation. The simulation results show the following. (a) In accord with the normal flood-control regulation discharge, the maximum water level above the dam should be not more than 175m, which ensures the safety of the dam and reservoir area. However, it is necessary to utilize the flood diversion areas within the Jingjiang area, and flood discharge can reach 2.81 billion m(3). (b) In the case of relying on the TGR to impound floodwaters independently rather than using the flood diversion areas, the maximum water level above the dam reaches 177.35m, which is less than the flood check level of 180.4m to ensure the safety of the Three Gorges Dam. The average increase of the TGR water level in the Chongqing area is not more than 0.11m, which indicates no significant effect on the upstream reservoir area. Comparing the various scheduling schemes, when the flood diversion areas are not used, it is believed that the TGR can execute safe flood control for a 1,000-year flood, thereby greatly reducing flood damage.
引用
收藏
页码:1625 / 1634
页数:10
相关论文
共 50 条
  • [31] Analysis of the effect of regional lateral inflow on the flood peak of the Three Gorges Reservoir
    Wang BaiWei
    Tian FuQiang
    Hu HePing
    SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2011, 54 (04) : 914 - 923
  • [32] Analysis of the effect of regional lateral inflow on the flood peak of the Three Gorges Reservoir
    BaiWei Wang
    FuQiang Tian
    HePing Hu
    Science China Technological Sciences, 2011, 54 : 914 - 923
  • [33] A real-time operation of the Three Gorges Reservoir with flood risk analysis
    Sun, Yixiang
    Tang, Deshan
    Dai, Huichao
    Liu, Pan
    Sun, Yifei
    Cui, Qingfeng
    Zhang, Fanping
    Ding, Yifan
    Wei, Yuhang
    Zhang, Jinxin
    Wang, Mei
    Li, Aodian
    Meng, Zhenzhu
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2016, 16 (02): : 551 - 562
  • [34] Study on an ahead of schedule impounding scheme of the Three Gorges Project (TGP) in the flood recession period
    Peng, Yang
    Li, Yitian
    Xie, Baoling
    Zhao, Mingdeng
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2002, (03):
  • [35] Study on the mechanism of the influence of flood storage at the end of the Three Gorges Reservoir on the phosphorus forms in the sediments of the tributary reservoir bay
    Liu, Xinyuan
    Pan, Baozhu
    Song, Linxu
    Yang, Zhengjian
    Ji, Daobin
    Cui, Yujie
    Su, Qingqing
    AQUATIC SCIENCES, 2020, 82 (02)
  • [36] Study on the mechanism of the influence of flood storage at the end of the Three Gorges Reservoir on the phosphorus forms in the sediments of the tributary reservoir bay
    Xinyuan Liu
    Baozhu Pan
    Linxu Song
    Zhengjian Yang
    Daobin Ji
    Yujie Cui
    Qingqing Su
    Aquatic Sciences, 2020, 82
  • [37] A study on determination scheme of reservoir releases for a forecasted flood
    Kwon, OI
    Shim, MP
    Sonu, JH
    WATER RESOURCES PLANNING AND MANAGEMENT, 1999, : 125 - 138
  • [38] Study on Flood Resources Utilization Dispatching Method of the Three Gorges Reservoir Based on the Demand of Power Generation
    He Xiaocong
    Yan Binjun
    Yan Lingzhi
    2018 3RD ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2018), 2018, 366
  • [39] Spatiotemporal evolution and influencing factors of flood control storage sedimentation in the Three Gorges Reservoir, Changjiang River, China
    Guo, Chao
    Jin, Zhongwu
    Liang, Dongfang
    Nones, Michael
    Zhou, Yinjun
    CATENA, 2024, 243
  • [40] Flood Control Capacity of the Three Gorges Project for Different Frequency Floods
    Yan, Qiming
    Jing, Zhu
    Xia, Zhongxi
    Zhang, Shanghong
    ENVIRONMENTAL ENGINEERING SCIENCE, 2021, 38 (12) : 1195 - 1205