Micro gas turbine cogeneration system with latent heat storage at the University: Part II: Part load and thermal priority mode

被引:12
|
作者
Kurata, Osamu [1 ]
Iki, Norihiko [1 ]
Matsunuma, Takayuki [1 ]
Maeda, Tetsuhiko [2 ]
Hirano, Satoshi [3 ]
Kadoguchi, Katsuhiko [4 ]
Takeuchi, Hiromi [4 ]
Yoshida, Hiro [5 ]
机构
[1] Natl Inst Adv Ind Sci & Technol, Energy Technol Res Inst, Turbomachinery Grp, Tsukuba, Ibaraki 3058564, Japan
[2] Natl Inst Adv Ind Sci & Technol, Energy Technol Res Inst, Socioecon & Policy Study Grp, Tsukuba, Ibaraki 3058564, Japan
[3] Natl Inst Adv Ind Sci & Technol, Energy Technol Res Inst, Thermal & Fluid Syst Grp, Tsukuba, Ibaraki 3058569, Japan
[4] Natl Inst Adv Ind Sci & Technol, Energy Technol Res Inst, Tsukuba, Ibaraki 305, Japan
[5] Kanagawa Inst Technol, Dept Vehicle Syst Engn, Atsugi, Kanagawa 2430292, Japan
关键词
Cogeneration system; Micro gas turbine; Latent heat storage; Phase-change material; University; Energy flow; Part-load operation; Thermal priority mode; Programmable logic controller; PERFORMANCE ANALYSIS; POWER; MICROTURBINE; OPERATION;
D O I
10.1016/j.applthermaleng.2013.12.050
中图分类号
O414.1 [热力学];
学科分类号
摘要
A good cogeneration system should have high efficiency and good coordination. A micro gas turbine cogeneration system with latent heat storage was demonstrated at the University. Since there had been no cogeneration system with the latent heat storage under service condition, this system was the first demonstration and its characteristic was very important. The proper use of the latent heat storage system will save energy economically, store high energy density, reduce exhaust emissions, and save operational costs. A heat exchanger and an economizer were located in parallel downstream of a bypass dumper for exhaust gas. The latent heat storage tank was located downstream of the economizer. The bypass dumper released exhaust gas when the boiler water in the heat exchanger exceeded 90 C. It is very important to use the heat supply of hot water as much as possible. At the University, the winter term heat demand from 6 pm to 7 pm was somewhat less than that from 8 am to 6 pm in 2010. We conducted a part-load operation from 6 pm to 7 pm to observe how it would respond to the heat demand. The heat supply from the cogeneration system during this time period was controllable with the heat storage. The heat supply from the system at the lowest power setting was larger than the heat demand, and thus was uncontrollable without heat storage. In Part I [1], a fixed operating schedule of the system was planned and demonstrated at the University. Total 407 charge/discharge cycles of the latent heat storage were repeated. The energy flow test of the system shows the importance of heat release source and total system design. In Part III [2], a temperature control schedule of the system was demonstrated in winter morning using a new programmable logic controller (PLC). If the more larger latent heat storage system will be developed in the future, it will be expected greatly that the temperature of the classrooms are kept more comfortable with less energy consumptions and less CO2 emission. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:246 / 254
页数:9
相关论文
共 50 条
  • [1] Micro gas turbine cogeneration system with latent heat storage at the University: Part III: Temperature control schedule
    Kurata, Osamu
    Iki, Norihiko
    Matsunuma, Takayuki
    Maeda, Tetsuhiko
    Hirano, Satoshi
    Kadoguchi, Katsuhiko
    Takeuchi, Hiromi
    Yoshida, Hiro
    APPLIED THERMAL ENGINEERING, 2014, 70 (01) : 705 - 715
  • [2] Micro gas turbine cogeneration system with latent heat storage at the University: Part I: Plan and energy flow test
    Kurata, Osamu
    Iki, Norihiko
    Matsunuma, Takayuki
    Maeda, Tetsuhiko
    Hirano, Satoshi
    Kadoguchi, Katsuhiko
    Takeuchi, Hiromi
    Yoshida, Hiro
    APPLIED THERMAL ENGINEERING, 2014, 65 (1-2) : 513 - 523
  • [3] Thermoeconomic analysis of an intercooled, reheat, and recuperated gas turbine for cogeneration applications - Part II: Part-load operation
    Bhargava, R
    di Montenegro, GN
    Peretto, A
    JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2002, 124 (04): : 892 - 903
  • [4] EFFECT OF CONTROL MODES AND TURBINE COOLING ON THE PART LOAD PERFORMANCE IN THE GAS-TURBINE COGENERATION SYSTEM
    KIM, TS
    RO, ST
    HEAT RECOVERY SYSTEMS & CHP, 1995, 15 (03): : 281 - 291
  • [5] Part-load performance of CCHP with gas turbine and storage system
    Institute of Engineering Thermophysics, Chinese Academy of Sciences, Beijing 100080, China
    Zhongguo Dianji Gongcheng Xuebao, 2006, 4 (25-30):
  • [6] The efficiency of using cogeneration turbine installations in the variable part of the heat and electric load schedules
    Efros, E.I.
    Gutorov, V.F.
    Simoyu, L.L.
    Sushchikh, V.M.
    Teploenergetika, 2002, (06): : 2 - 8
  • [7] PART LOAD BEHAVIOR OF A MICRO GAS TURBINE FED WITH DIFFERENT FUELS
    Calabria, Raffaela
    Chiariello, Fabio
    Massoli, Patrizio
    Reale, Fabrizio
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2014, VOL 1B, 2014,
  • [8] PERFORMANCE OF GAS-TURBINE HEAT RECOVERY-SYSTEM - (ANALYSIS OF PART LOAD PERFORMANCE)
    SONODA, T
    SAITO, T
    TANIGUCHI, H
    BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1976, 19 (127): : 45 - 53
  • [9] Analysis on Energy Saving for a Cool, Heat and Power Cogeneration System with a Micro Gas Turbine
    Yang Wansheng
    Guo Kaihua
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [10] Typical part-load performances of constant speed single shaft gas turbine and its cogeneration
    Cai, Ruixian
    Zhang, Na
    Kung Cheng Je Wu Li Hsueh Pao/Journal of Engineering Thermophysics, 19 (02): : 145 - 149