EFDC simulation of fishway in the Diversion Dahaerteng River to Danghe Reservoir, China

被引:16
|
作者
Song, Weiwei [1 ,2 ,3 ]
Xu, Qing [4 ]
Fu, Xingqian [5 ]
Wang, Changfangzi [1 ]
Pang, Yong [1 ]
Song, Dahao [5 ]
机构
[1] Hohai Univ, Coll Environm, Key Lab Integrated Regulat & Resource Dev Shallow, Minist Educ, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Hydrol & Water Resources, Nanjing 210098, Jiangsu, Peoples R China
[3] Univ Miami, Coll Engn, Coral Gables, FL 33146 USA
[4] Yangzhou Univ, Sch Hydraul Energy & Power Engn, Yangzhou 225009, Jiangsu, Peoples R China
[5] Jiangsu Normal Univ, Kewen Coll, Xuzhou 221116, Jiangsu, Peoples R China
关键词
Diversion Dahaerteng River to Danghe; Reservoir engineering project; Triplophysa; Nature-like; Fishway; Flow field simulation; EFDC model; VERTICAL-SLOT FISHWAY; PASSAGE PERFORMANCE; YANGTZE-RIVER; LAKE TAIHU; MODEL; FLOW; EUTROPHICATION; SEDIMENT; STURGEON; FISHES;
D O I
10.1016/j.ecolind.2019.03.025
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
In order to mitigate the threat that hydraulic engineering will have on the fish's living environment, fish migration can be accomplished by building fishway. This paper takes the Diversion Dahaerteng River to Danghe Reservoir project in Gansu, China as an example. Through field investigation and data analysis, it was found that the main fish in the study area was Triplophysa. Through the comparison of the advantages and disadvantages of the fishways, it is determined that the fishway and the nature-like fishway are suitable. By constructing the evaluation method, the 19 indicators of the fishway were scored from the aspects of ability to lure fish, ability to pass fish, fish adaptability, engineering quantity, operation and maintenance, and the nature-like fishway was determined to be the best choice. The surface runoff from March to August is calculated by the P-III curve to simulate the flow field of the Dahaerteng River under the conditions of maximum, minimum and average runoff. The flow velocity of the simulation results is suitable for the Triplophysa migration, and the right bank is suitable for building nature-like fishway. The fishway section is rectangular, with a slope of 1%, a width of 2 m, and a total length of 520 m. It is arranged with a staggered baffle, and the revetment is rough masonry stones. The inside of the fishway is inlaid with pebbles so that the roughness of the fishway is more than 0.03. Then, numerical simulation calculations were carried out for the fishways composed of the partitions of 10m and 5m apart. The comparison shows that the fishway with the partition gap 5m is closer to the right bank of the river, which is suitable for Triplophysa migration and survival. For later evaluation and adjustment, an observation room and a fish collection pool are provided near the entrance of the fishway, and an observation room is provided near the exit. This paper can provide reference for the planning, construction and post evaluation of fishways.
引用
收藏
页码:704 / 715
页数:12
相关论文
共 50 条
  • [41] Main engineering geological problems and evaluation on the reservoir engineering of Yellow River water diversion and irrigation area
    Huang, Zhiquan
    Chen, Tailin
    Wang, Anming
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 2071 - +
  • [42] Effects of the Water Diversion Project from the Three Gorges Reservoir to the Hanjiang River on diatom blooms in Middle and Lower reaches of the Hanjiang River
    Liu, Yangyang
    Lin, Honghui
    Wang, Meng
    Li, Fei
    Wang, Zhongmin
    Xiao, Yang
    Li, Ran
    Shen, Dandan
    WATER SCIENCE AND TECHNOLOGY, 2024, 90 (05) : 1381 - 1396
  • [43] Quantitative Assessment and Regulation of Passage and Entrance Attraction Efficiency of Vertical-Slot Fishway on Heishuihe River in Southwest China
    Xu, Jiawei
    Li, Dongqing
    Hu, Xiaozhang
    Jiao, Yilin
    Wang, Jianping
    Wu, Yujiao
    Lin, Chenyu
    Ke, Senfan
    Bai, Tianxiang
    Wang, Nannan
    Liu, Bingjun
    Shi, Xiaotao
    ANIMALS, 2024, 14 (16):
  • [44] Reservoir water temperature simulation and sensitivity analysis: A case study of the Qincun Reservoir in China
    Feng, Xinyue
    Lu, Baohong
    Wang, Meng
    Qin, Youwei
    Song, Yang
    Pei, Ying
    Sheng, Wenlong
    SCIENCE OF THE TOTAL ENVIRONMENT, 2024, 940
  • [45] Seismic liquefaction analysis of a reservoir dam foundation in the South-North Water Diversion Project in China. Part II: seismic response simulation
    Huang, Yu
    Zheng, Hu
    Zhuang, Zhijing
    NATURAL HAZARDS, 2012, 60 (03) : 1313 - 1324
  • [46] Environmental impact assessments of the Xiaolangdi Reservoir on the most hyperconcentrated laden river, Yellow River, China
    Dongxian Kong
    Chiyuan Miao
    Jingwen Wu
    Alistair G.L. Borthwick
    Qingyun Duan
    Xiaoming Zhang
    Environmental Science and Pollution Research, 2017, 24 : 4337 - 4351
  • [47] Environmental impact assessments of the Xiaolangdi Reservoir on the most hyperconcentrated laden river, Yellow River, China
    Kong, Dongxian
    Miao, Chiyuan
    Wu, Jingwen
    Borthwick, Alistair G. L.
    Duan, Qingyun
    Zhang, Xiaoming
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2017, 24 (05) : 4337 - 4351
  • [48] A real time simulation and forecasting apllication of Yellow River Diversion Project Conveyance line
    Zhao, Xiping
    Li, Jianping
    Xie, Keming
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 3675 - 3678
  • [49] SIMULATION TECHNIQUE AND MANNER OF PRESENTATION FOR A BELLY RIVER RESERVOIR DEPLETION STUDY
    WADE, R
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 1978, 17 (01): : 28 - 28
  • [50] Waste load reallocation in river–reservoir systems: simulation–optimization approach
    Abbas Afshar
    Fariborz Masoumi
    Environmental Earth Sciences, 2016, 75